Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects

被引:140
|
作者
Li, Jie [1 ]
Zou, Patrick X. W. [2 ,3 ,4 ]
机构
[1] Nanjing Forestry Univ, Sch Civil Engn, Nanjing, Peoples R China
[2] Univ Canberra, Fac Business & Govt, Canberra, ACT 2601, Australia
[3] Univ New S Wales, Fac Built Environm, Sydney, NSW, Australia
[4] Hunan Univ, Risk Management Coll Civil Engn, Changsha 410082, Hunan, Peoples R China
关键词
PPP project; Fuzzy; Analytical hierarchy process (AHP); Risk assessment;
D O I
10.1061/(ASCE)CO.1943-7862.0000362
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public Private Partnerships (PPPs) have been used globally as a method to procure infrastructure projects, such as expressways, bridges, water plants, and power plants. The risks involved in such PPP projects are unique because of the large amount of investment and long contractual concession period. This paper proposed a fuzzy analytical hierarchy process (AHP) as risk assessment technique to simulate the vagueness of human judgement and to improve the assessment accuracy. Furthermore, a comparison was made between the proposed fuzzy AHP and straight-AHP in this paper. The fuzzy AHP process was illustrated by using an actual PPP expressway project from China. The results showed that planning deficiency, low project residual value (after 30 years of operation), lack of qualified bidders, design deficiency, and long project approval time were assessed as the top five risks for the project, and the feedback from the experts showed that these results reflected the actual project risk situation. DOI: 10.1061/(ASCE)CO.1943-7862.0000362. (C) 2011 American Society of Civil Engineers.
引用
收藏
页码:1205 / 1209
页数:5
相关论文
共 50 条
  • [21] A Fuzzy-Based Risk Assessment Methodology for Construction Projects Under Epistemic Uncertainty
    Tarun Kumer Biswas
    Kais Zaman
    [J]. International Journal of Fuzzy Systems, 2019, 21 : 1221 - 1240
  • [22] A Fuzzy-Based Risk Assessment Methodology for Construction Projects Under Epistemic Uncertainty
    Biswas, Tarun Kumer
    Zaman, Kais
    [J]. INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2019, 21 (04) : 1221 - 1240
  • [23] AHP-based methodology for selecting safety devices of industrial machinery
    Caputo, Antonio C.
    Pelagagge, Pacifico M.
    Salini, Paolo
    [J]. SAFETY SCIENCE, 2013, 53 : 202 - 218
  • [24] Risk identification and assessment in PPP infrastructure projects using fuzzy analytical hierarchy process and life-cycle methodology
    Li, Jie
    Zou, Patrick X. W.
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2008, 8 (01):
  • [25] Pythagorean fuzzy AHP based risk assessment methodology for hazardous material transportation: an application in Istanbul
    Ertugrul Ayyildiz
    Alev Taskin Gumus
    [J]. Environmental Science and Pollution Research, 2021, 28 : 35798 - 35810
  • [26] Pythagorean fuzzy AHP based risk assessment methodology for hazardous material transportation: an application in Istanbul
    Ayyildiz, Ertugrul
    Taskin Gumus, Alev
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (27) : 35798 - 35810
  • [27] Fuzzy Logic and AHP-Based Ranking of Cloud Service Providers
    Chahal, Rajanpreet Kaur
    Singh, Sarbjeet
    [J]. COMPUTATIONAL INTELLIGENCE IN DATA MINING, VOL 1, CIDM 2015, 2016, 410 : 337 - 346
  • [28] AHP-based Fuzzy Evaluation System of Municipal Transportation Efficiency
    Zhang, Jue
    Liu, Hongli
    [J]. SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1890 - 1894
  • [29] A FUZZY AHP-BASED FAULT DIAGNOSIS FOR SEMICONDUCTOR LITHOGRAPHY PROCESS
    Shen, Chien-wen
    Cheng, Ming Jen
    Chen, Cheng-Wu
    Tsai, Feng-Ming
    Cheng, Yu-Chenr
    [J]. INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2011, 7 (02): : 805 - 815
  • [30] Global supplier development considering risk factors using fuzzy extended AHP-based approach
    Chan, Felix T. S.
    Kumar, Niraj
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04): : 417 - 431