A Fuzzy-Based Risk Assessment Methodology for Construction Projects Under Epistemic Uncertainty

被引:24
|
作者
Biswas, Tarun Kumer [1 ,2 ]
Zaman, Kais [2 ]
机构
[1] Jessore Univ Sci & Technol, Dept Ind & Prod Engn, Jessore 7408, Bangladesh
[2] Bangladesh Univ Engn & Technol, Dept Ind & Prod Engn, Dhaka 1000, Bangladesh
关键词
Risk assessment; Epistemic uncertainty; Degree of uncertainty; Fuzzy logic; VIKOR; DECISION-MAKING; EXTENSION; RANKING; TOPSIS;
D O I
10.1007/s40815-018-00602-w
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a methodology for construction projects risk assessment under epistemic uncertainty (i.e., uncertainty arising from lack of data/knowledge) has been proposed. In practice, as the sufficient data from historical sources for probabilistic analysis are quite difficult to obtain, qualitative risk assessment methodologies based on expert's judgments are commonly used in construction industry. However, these insufficient probabilistic data combined with experts' judgments can be used in the risks evaluation process to reduce uncertainties and biasness. All the methodologies developed so far have assumed that the degrees of uncertainties (i.e., levels of uncertainties) involved in individual risk event are equal. However, in practice, the degree of uncertainties that involved in each risk event may vary due to the variation in the availability or quality of data obtained from multiple sources (e.g., from experts' opinions and past data from similar projects). Therefore, evaluation of risks considering the degree of uncertainty involved in individual risk events may assist project manager in setting-up response strategies to mitigate threat to the project objectives. This paper proposes a risk assessment methodology using triangular fuzzy numbering system to compute risk value by combining expert's opinion and insufficient historical data. A modified form of general ramp-type fuzzy membership function for quantification of uncertainty range of each risk event and an extended VIKOR method for risk ranking with these uncertainty ranges have been used. The most notable difference with other fuzzy risk assessment methods is the use of algorithm to handle the uncertainties involved in individual risk event. The proposed risk assessment methodology is illustrated for two practical example problems: (1) a steel-frame structured building and (2) a rehabilitation project of a building.
引用
收藏
页码:1221 / 1240
页数:20
相关论文
共 50 条
  • [1] A Fuzzy-Based Risk Assessment Methodology for Construction Projects Under Epistemic Uncertainty
    Tarun Kumer Biswas
    Kais Zaman
    [J]. International Journal of Fuzzy Systems, 2019, 21 : 1221 - 1240
  • [2] Construction project proposal evaluation under uncertainty: A fuzzy-based approach
    Singh, Pushpinder
    Ruparathna, Rajeev
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (03) : 291 - 300
  • [3] Fuzzy-Based Methodology for Risk Assessment in Water Treatment Plants
    Marzouk, Mohamed
    Ahmed, Rasha
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2018, 32 (01)
  • [4] Construction Projects Risk Assessment based on Fuzzy AHP
    Gohar, A. Sotoodeh
    Khanzadi, M.
    Jalal, M. Parchami
    Javid, A. A. Shirzadi
    [J]. 2009 IEEE STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT: SCORED 2009, PROCEEDINGS, 2009, : 570 - 573
  • [5] Risk-based reliability assessment under epistemic uncertainty
    Khalaj, M.
    Makui, A.
    Tavakkoli-Moghaddam, R.
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2012, 25 (03) : 571 - 581
  • [6] A Fuzzy-based Methodology for an Aggregative Environmental Risk Assessment of Restored Soil
    WANG ShiZhong
    ZHAO ZhiHao
    XIA Bing
    QIU Hao
    JLMOREL
    QIU RongLiang
    [J]. Pedosphere, 2014, (02) - 231
  • [7] A Fuzzy-based Methodology for an Aggregative Environmental Risk Assessment of Restored Soil
    Wang Shi-Zhong
    Zhao Zhi-Hao
    Xia Bing
    Qiu Hao
    Morel, J. L.
    Qiu Rong-Liang
    [J]. PEDOSPHERE, 2014, 24 (02) : 220 - 231
  • [8] A Fuzzy-based Methodology for an Aggregative Environmental Risk Assessment of Restored Soil
    WANG Shi-Zhong
    ZHAO Zhi-Hao
    XIA Bing
    QIU Hao
    J.L.MOREL
    QIU Rong-Liang
    [J]. Pedosphere, 2014, 24 (02) : 220 - 231
  • [9] Risk assessment methodology for underground construction projects
    Choi, HH
    Cho, HN
    Seo, JW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) : 258 - 272
  • [10] THE METHODOLOGY OF RISK ASSESSMENT IN THE PLANNING OF CONSTRUCTION PROJECTS
    Szafranko, Elzbleta
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 430 - 437