A Fuzzy-Based Risk Assessment Methodology for Construction Projects Under Epistemic Uncertainty

被引:24
|
作者
Biswas, Tarun Kumer [1 ,2 ]
Zaman, Kais [2 ]
机构
[1] Jessore Univ Sci & Technol, Dept Ind & Prod Engn, Jessore 7408, Bangladesh
[2] Bangladesh Univ Engn & Technol, Dept Ind & Prod Engn, Dhaka 1000, Bangladesh
关键词
Risk assessment; Epistemic uncertainty; Degree of uncertainty; Fuzzy logic; VIKOR; DECISION-MAKING; EXTENSION; RANKING; TOPSIS;
D O I
10.1007/s40815-018-00602-w
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a methodology for construction projects risk assessment under epistemic uncertainty (i.e., uncertainty arising from lack of data/knowledge) has been proposed. In practice, as the sufficient data from historical sources for probabilistic analysis are quite difficult to obtain, qualitative risk assessment methodologies based on expert's judgments are commonly used in construction industry. However, these insufficient probabilistic data combined with experts' judgments can be used in the risks evaluation process to reduce uncertainties and biasness. All the methodologies developed so far have assumed that the degrees of uncertainties (i.e., levels of uncertainties) involved in individual risk event are equal. However, in practice, the degree of uncertainties that involved in each risk event may vary due to the variation in the availability or quality of data obtained from multiple sources (e.g., from experts' opinions and past data from similar projects). Therefore, evaluation of risks considering the degree of uncertainty involved in individual risk events may assist project manager in setting-up response strategies to mitigate threat to the project objectives. This paper proposes a risk assessment methodology using triangular fuzzy numbering system to compute risk value by combining expert's opinion and insufficient historical data. A modified form of general ramp-type fuzzy membership function for quantification of uncertainty range of each risk event and an extended VIKOR method for risk ranking with these uncertainty ranges have been used. The most notable difference with other fuzzy risk assessment methods is the use of algorithm to handle the uncertainties involved in individual risk event. The proposed risk assessment methodology is illustrated for two practical example problems: (1) a steel-frame structured building and (2) a rehabilitation project of a building.
引用
收藏
页码:1221 / 1240
页数:20
相关论文
共 50 条
  • [21] Fuzzy-based network bandwidth design under demand uncertainty
    Yu, Lean
    Yue, Wuyi
    Wang, Shouyang
    [J]. JOURNAL OF SYSTEMS SCIENCE & COMPLEXITY, 2010, 23 (01) : 61 - 70
  • [22] FUZZY-BASED NETWORK BANDWIDTH DESIGN UNDER DEMAND UNCERTAINTY
    Lean YU Institute of Systems Science
    [J]. Journal of Systems Science & Complexity, 2010, 23 (01) : 61 - 70
  • [23] Fuzzy-based network bandwidth design under demand uncertainty
    Lean Yu
    Wuyi Yue
    Shouyang Wang
    [J]. Journal of Systems Science and Complexity, 2010, 23 : 61 - 70
  • [24] Examining the OHS of green building construction projects: A hybrid fuzzy-based approach
    Durdyev, Serdar
    Mohandes, Saeed Reza
    Tokbolat, Serik
    Sadeghi, Haleh
    Zayed, Tarek
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 338
  • [25] A new fuzzy-based approach for environmental risk assessment
    Oturakci, Murat
    [J]. HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2019, 25 (07): : 1718 - 1728
  • [26] Towards the development of a comprehensive hybrid fuzzy-based occupational risk assessment model for construction workers
    Mohandes, Saeed Reza
    Zhang, Xueqing
    [J]. SAFETY SCIENCE, 2019, 115 : 294 - 309
  • [27] Risk-based safety impact assessment methodology for underground construction projects in Korea
    Seo, J. W.
    Choi, Hyun Ho
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (01) : 72 - 81
  • [28] A scheduling methodology for dealing with uncertainty in construction projects
    Bruni, Maria Elena
    Beraldi, Patrizia
    Guerriero, Francesca
    Pinto, Erika
    [J]. ENGINEERING COMPUTATIONS, 2011, 28 (7-8) : 1064 - 1078
  • [29] Application of a fuzzy based decision making methodology to construction project risk assessment
    Zeng, Jiahao
    An, Min
    Smith, Nigel John
    [J]. International Journal of Project Management, 2007, 25 (06) : 589 - 600
  • [30] Fuzzy-based methodology for performance assessment of emergency planning and its application
    Chen, Guohua
    Zhang, Xinmei
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (02) : 125 - 132