Time of Involvement and Dispute Occurrence in Public Highway Projects

被引:0
|
作者
Hasanzadeh, Sogand [1 ]
Esmaeili, Behzad [2 ]
Gad, Ghada M. [3 ]
Gransberg, Douglas D. [4 ]
Nasrollahi, Samaneh [5 ]
机构
[1] Virginia Tech, Charles Edward Via Jr Dept Civil & Environm Engn, Blacksburg, VA 24061 USA
[2] George Mason Univ, Volgenau Sch Engn, Dept Civil Environm & Infrastruct Engn, Fairfax, VA 22030 USA
[3] Calif State Polytech Univ Pomona, Dept Civil Engn, Pomona, CA 91768 USA
[4] Iowa State Univ, Dept Civil Construct & Environm Engn, Ames, IA 50010 USA
[5] Robertson Construct Serv, Thornwood Dr, Heath, OH 43055 USA
关键词
EARLY CONTRACTOR INVOLVEMENT; CONSTRUCTION; PERFORMANCE; DESIGN;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Disputes are common in the construction industry and lead to unnecessary costs and schedule overruns in projects. While many believe that project stakeholders' early involvement in projects impact performance metrics such as the frequency and severity of disputes over a project, no previous study has empirically tested this hypothesis. Therefore, this study empirically tested the following two null hypotheses as they relate to public highway projects: (1) project stakeholders' time-of-involvement in the pre-design, conceptual design, schematic design, design development, construction document, and bidding phases do not yield significant differences in project performance metrics; and (2) there are no significant differences in project performance metrics between projects that feature project stakeholders' involvement before the project bidding and those that involve project stakeholders after bidding. To test these hypotheses, this study developed and distributed a survey instrument to procurement personnel in state departments of transportation (DOTs) across the United States. Data on 60 projects from 22 DOTs were received. The data obtained were analyzed to find any statistically significant difference between dispute frequency and severity, relevant performance metrics, and the time-of-involvement of project stakeholders (such as contractors and subcontractors). The general trend in most project dispute performance metrics indicated that as the time-of-involvement moved from the pre-design to the bidding phase, the frequency and severity of disputes increased. While the differences between construction satisfaction and overall success were minor, projects in which stakeholders were involved earlier in the project had lower schedule and cost growth and significantly different design satisfaction level. The findings of this study contribute to theory by expanding knowledge about the role of early involvement of contractors and subcontractors on projects' performance. Concurrently, the results provide empirical evidence for decision makers in DOTs to make better-informed decisions regarding the selection of projects' organization.
引用
收藏
页码:161 / 170
页数:10
相关论文
共 50 条
  • [31] Key uncertainty events impacting on the completion time of highway construction projects
    Moghayedi, Alireza
    Windapo, Abimbola
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2019, 6 (02) : 275 - 298
  • [32] Key uncertainty events impacting on the completion time of highway construction projects
    Alireza Moghayedi
    Abimbola Windapo
    [J]. Frontiers of Engineering Management, 2019, 6 : 275 - 298
  • [33] The entanglement of time and cost deviations in public projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. ANNALS OF PUBLIC AND COOPERATIVE ECONOMICS, 2023, 94 (01) : 241 - 272
  • [34] Factors for Time and Cost Overrun in Public Projects
    Idrees, Shehryar
    Shafiq, Muhammad Tariq
    [J]. Journal of Engineering, Project, and Production Management, 2021, 11 (03) : 243 - 254
  • [35] The Determinants of Time Overruns in Portuguese Public Projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (02)
  • [36] STATUS REPORT ON HIGHWAY-RELATED PUBLIC TRANSPORTATION PROJECTS IN UNITED-STATES
    MORIN, DA
    [J]. TRANSPORTATION, 1972, 1 (01) : 69 - 78
  • [37] Arrangement of financing for highway infrastructure projects under the conditions of Public-Private Partnership
    Khmel, Vialeta
    Zhao, Shengchuan
    [J]. IATSS RESEARCH, 2016, 39 (02) : 138 - 145
  • [38] PUBLIC PRIVATE PARTNERSHIPS FOR HIGHWAY INFRASTRUCTURE: LESSONS LEARNED FROM "PROBLEM" PROJECTS IN THE US
    Moore, A.
    Staley, S.
    Li, Z.
    Oklobdzija, S.
    [J]. TRANSPORT DYNAMICS, 2011, : 549 - 556
  • [39] Recommended Opportunities for the Development of Highway Public-Private Partnership Projects in the United States
    Mostaan, Kia
    Ashuri, Baabak
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 549 - 558
  • [40] Funding and Finance Analysis of Public-Private Partnership Highway Projects: Exploratory Study
    Fathi, Medya
    Shrestha, Pramen P.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (03)