Time of Involvement and Dispute Occurrence in Public Highway Projects

被引:0
|
作者
Hasanzadeh, Sogand [1 ]
Esmaeili, Behzad [2 ]
Gad, Ghada M. [3 ]
Gransberg, Douglas D. [4 ]
Nasrollahi, Samaneh [5 ]
机构
[1] Virginia Tech, Charles Edward Via Jr Dept Civil & Environm Engn, Blacksburg, VA 24061 USA
[2] George Mason Univ, Volgenau Sch Engn, Dept Civil Environm & Infrastruct Engn, Fairfax, VA 22030 USA
[3] Calif State Polytech Univ Pomona, Dept Civil Engn, Pomona, CA 91768 USA
[4] Iowa State Univ, Dept Civil Construct & Environm Engn, Ames, IA 50010 USA
[5] Robertson Construct Serv, Thornwood Dr, Heath, OH 43055 USA
关键词
EARLY CONTRACTOR INVOLVEMENT; CONSTRUCTION; PERFORMANCE; DESIGN;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Disputes are common in the construction industry and lead to unnecessary costs and schedule overruns in projects. While many believe that project stakeholders' early involvement in projects impact performance metrics such as the frequency and severity of disputes over a project, no previous study has empirically tested this hypothesis. Therefore, this study empirically tested the following two null hypotheses as they relate to public highway projects: (1) project stakeholders' time-of-involvement in the pre-design, conceptual design, schematic design, design development, construction document, and bidding phases do not yield significant differences in project performance metrics; and (2) there are no significant differences in project performance metrics between projects that feature project stakeholders' involvement before the project bidding and those that involve project stakeholders after bidding. To test these hypotheses, this study developed and distributed a survey instrument to procurement personnel in state departments of transportation (DOTs) across the United States. Data on 60 projects from 22 DOTs were received. The data obtained were analyzed to find any statistically significant difference between dispute frequency and severity, relevant performance metrics, and the time-of-involvement of project stakeholders (such as contractors and subcontractors). The general trend in most project dispute performance metrics indicated that as the time-of-involvement moved from the pre-design to the bidding phase, the frequency and severity of disputes increased. While the differences between construction satisfaction and overall success were minor, projects in which stakeholders were involved earlier in the project had lower schedule and cost growth and significantly different design satisfaction level. The findings of this study contribute to theory by expanding knowledge about the role of early involvement of contractors and subcontractors on projects' performance. Concurrently, the results provide empirical evidence for decision makers in DOTs to make better-informed decisions regarding the selection of projects' organization.
引用
收藏
页码:161 / 170
页数:10
相关论文
共 50 条
  • [21] Research on government guarantees of highway PPP (Public-Private Partnerships) projects
    Wu, Zhenyao
    Shuai, Bin
    Hu, Peng
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2018, 38 (10): : 2652 - 2658
  • [22] An Integrated Sustainability Assessment Framework for Public-Private Partnerships in Highway Projects
    Alqahtani, Dhafer
    Salman, Baris
    He, Song
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING PART A-SYSTEMS, 2024, 150 (07)
  • [23] Public-Private Partnership Highway Projects: Identifying Project Selection Factors
    Fathi, Medya
    Shrestha, Pramen P.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (01)
  • [24] The Malaysian Public-Private Partnership (PPP): Financing the Tolled Highway Projects
    Alfan, Ervina
    [J]. ASIAN JOURNAL OF BUSINESS AND ACCOUNTING, 2010, 3 (02): : 121 - 143
  • [25] Development of a Framework for Identifying Highway Projects for Private-Public-Partnership Financing
    Tharmakulasingham, Kopikah
    Pasindu, H. R.
    [J]. ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2021, 54 : 49 - 60
  • [26] Investigation of the Contract Time Determination Systems Used for Highway Projects in the USA
    Abdel-Raheem, Mohamed
    Reyes, Jennifer
    [J]. TRANSPORTATION RESEARCH RECORD, 2020, 2674 (10) : 715 - 728
  • [27] Early contractor involvement (ECI): ways to do it in public projects
    Wondimu, Paulos A.
    Klakegg, Ole Jonny
    Laedre, Ola
    [J]. JOURNAL OF PUBLIC PROCUREMENT, 2020, 20 (01) : 62 - 87
  • [28] Impact of Alternative Delivery on the Response Time of Requests for Information for Highway Projects
    Papajohn, Dean
    El Asmar, Mounir
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (01)
  • [29] Litigation versus Judicial Arbitration as Binding Dispute Settlement Techniques in Public Construction Projects
    Alrasheed, Khaled
    Khalafallah, Ahmed
    AlShaheen, Afrah
    Albader, Haya
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (01)
  • [30] Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects
    Bakri, Anis Sazira
    Ab Razak, Muhammad Aminudin
    Abd Shukor, Ani Saifuza
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 280 - 288