Time of Involvement and Dispute Occurrence in Public Highway Projects

被引:0
|
作者
Hasanzadeh, Sogand [1 ]
Esmaeili, Behzad [2 ]
Gad, Ghada M. [3 ]
Gransberg, Douglas D. [4 ]
Nasrollahi, Samaneh [5 ]
机构
[1] Virginia Tech, Charles Edward Via Jr Dept Civil & Environm Engn, Blacksburg, VA 24061 USA
[2] George Mason Univ, Volgenau Sch Engn, Dept Civil Environm & Infrastruct Engn, Fairfax, VA 22030 USA
[3] Calif State Polytech Univ Pomona, Dept Civil Engn, Pomona, CA 91768 USA
[4] Iowa State Univ, Dept Civil Construct & Environm Engn, Ames, IA 50010 USA
[5] Robertson Construct Serv, Thornwood Dr, Heath, OH 43055 USA
关键词
EARLY CONTRACTOR INVOLVEMENT; CONSTRUCTION; PERFORMANCE; DESIGN;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Disputes are common in the construction industry and lead to unnecessary costs and schedule overruns in projects. While many believe that project stakeholders' early involvement in projects impact performance metrics such as the frequency and severity of disputes over a project, no previous study has empirically tested this hypothesis. Therefore, this study empirically tested the following two null hypotheses as they relate to public highway projects: (1) project stakeholders' time-of-involvement in the pre-design, conceptual design, schematic design, design development, construction document, and bidding phases do not yield significant differences in project performance metrics; and (2) there are no significant differences in project performance metrics between projects that feature project stakeholders' involvement before the project bidding and those that involve project stakeholders after bidding. To test these hypotheses, this study developed and distributed a survey instrument to procurement personnel in state departments of transportation (DOTs) across the United States. Data on 60 projects from 22 DOTs were received. The data obtained were analyzed to find any statistically significant difference between dispute frequency and severity, relevant performance metrics, and the time-of-involvement of project stakeholders (such as contractors and subcontractors). The general trend in most project dispute performance metrics indicated that as the time-of-involvement moved from the pre-design to the bidding phase, the frequency and severity of disputes increased. While the differences between construction satisfaction and overall success were minor, projects in which stakeholders were involved earlier in the project had lower schedule and cost growth and significantly different design satisfaction level. The findings of this study contribute to theory by expanding knowledge about the role of early involvement of contractors and subcontractors on projects' performance. Concurrently, the results provide empirical evidence for decision makers in DOTs to make better-informed decisions regarding the selection of projects' organization.
引用
收藏
页码:161 / 170
页数:10
相关论文
共 50 条
  • [1] Impact of Owners' Early Decisions on Project Performance and Dispute Occurrence in Public Highway Projects
    Hasanzadeh, Sogand
    Esmaeili, Behzad
    Nasrollahi, Samaneh
    Gad, Ghada M.
    Gransberg, Douglas D.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (02)
  • [2] Impacts of Levels of Trust on Dispute Occurrences in Highway Projects
    Hasanzadeh, Sogand
    Gad, Ghada M.
    Nasrollahi, Samaneh
    Esmaeili, Behzad
    Gransberg, Douglas D.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 497 - 507
  • [3] Dispute Avoidance in Public Construction Projects
    Tabish, Syed Zafar Shahid
    Jha, Kumar Neeraj
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (01)
  • [4] Highway projects: Prices in public bids
    Heralova, Renata Schneiderova
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 496 - 503
  • [5] PRIVATE FUNDING OF PUBLIC HIGHWAY PROJECTS
    CARLILE, JL
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 1994, 105 (01) : 53 - 63
  • [6] PUBLIC INVOLVEMENT IN THE DESIGN OF PUBLIC PROJECTS
    Mushtaha, Emad
    Hassan Omar, Omar
    Barakat, Dua S.
    Al-Jarwan, Hessa
    Abdulrahman, Dima
    Alsyouf, Imad
    [J]. OPEN HOUSE INTERNATIONAL, 2019, 44 (04) : 73 - 79
  • [7] Determining minimum contract time for highway projects
    Shr, JF
    Thompson, BP
    Russell, JS
    Ran, B
    Tserng, HP
    [J]. CONSTRUCTION 2000: MATERIALS AND CONSTRUCTION, 2000, (1712): : 196 - 201
  • [8] HIGHWAY PROJECTS - CAN THEY BE DONE IN HALF THE TIME
    BERNSTEIN, CS
    [J]. CIVIL ENGINEERING, 1983, 53 (09): : 50 - 54
  • [9] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    [J]. Journal of Information Technology in Construction, 2022, 27 : 595 - 618
  • [10] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2022, 27 : 595 - 618