摘要
An increasing number of state highway agencies (SHAs) are using A (cost): + B (time cost) bidding (A + B bidding) for highway construction. The A + B bidding concept is designed to shorten the total contract time by allowing each contractor to bid the number of days in which the work can lie accomplished, in addition to the traditional cost bid. The SHA is then presented with the problem of determining a reasonable range of contract time submitted by the bidders. Most SHAs do not currently restrict the range of B. However, several problems may arise from an unrestricted range of B. First, if no minimum is set for B, a bidder may inflate the cost bid and submit an unreasonably low B, using the excess cost bid to cover the disincentives charged for exceeding the time bid. Second; if no maximum is set for B, then a bidder with a high B and a low-cost bid may be awarded the job and make an unreasonable amount of, money from incentive payments. This study develops a quantified model of the price-time bidding contract. A construction cost-versus-time curve is developed from Florida Department of Transportation (DOT) data: The contractor's price-versus-time curve is then combined with the road-user cost to determine the optimum lower limit to be set on B: Finally, several projects completed by the Florida DOT will be used to illustrate this model.
引用
收藏
页码:196 / 201
页数:6
相关论文
共 50 条
  • [1] Dynamic Contract Time Determination System for Highway Projects
    Abdel-Raheem, Mohamed
    Torres Cantu, Cuauhtemoc
    Wang, Xiaohui
    [J]. TRANSPORTATION RESEARCH RECORD, 2020, 2674 (05) : 381 - 392
  • [2] Automated contract time determination system for highway projects
    Jeong, Hyung Seok
    Atreya, Siddharth
    Oberlender, Garold D.
    Chung, BooYoung
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 957 - 965
  • [3] Method to determine minimum contract bid for A+B+I/D highway projects
    Shr, JF
    Ran, B
    Sung, CW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 509 - 516
  • [4] Investigation of the Contract Time Determination Systems Used for Highway Projects in the USA
    Abdel-Raheem, Mohamed
    Reyes, Jennifer
    [J]. TRANSPORTATION RESEARCH RECORD, 2020, 2674 (10) : 715 - 728
  • [5] Determining Highway Project Contract Time from Project Duration Estimates
    Le, Chau
    Jeong, H. David
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [6] An Evaluation of a Predictive Conceptual Method for Contract Time Determination on Highway Projects Based on Project Types
    Okere, George
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (7A) : 1057 - 1073
  • [7] An Evaluation of a Predictive Conceptual Method for Contract Time Determination on Highway Projects Based on Project Types
    George Okere
    [J]. International Journal of Civil Engineering, 2019, 17 : 1057 - 1073
  • [8] Complexity in the Evaluation of Contract Types Employed for the Construction of Highway Projects
    Antoniou, Fani
    Aretoulis, Georgios N.
    Konstantinidis, Dimitrios
    Kalfakakou, Glykeria P.
    [J]. SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 448 - 458
  • [9] Engineers' Perception of Contract Types' Performance for Highway Construction Projects
    Antoniou, Fani
    Aretoulis, Georgios N.
    Konstantinidis, Dimitrios
    Kalfakakou, Glykeria P.
    [J]. INTERNATIONAL JOURNAL OF APPLIED BEHAVIORAL ECONOMICS, 2013, 2 (04) : 1 - 24
  • [10] Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects
    Papajohn, Dean
    El Asmar, Mounir
    Molenaar, Keith R.
    Alleman, Doug
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (01)