Contract time is the maximum time allowed in the contract for the completion of the project scope of work. The allowed time must be enough for adequate completion and yet not too long that it delays the use of the project. The current practice of determining contract time relies heavily on completed plans and specifications. However, there is always the need to come up with contract time at different project phases when the plans and specifications are not yet complete. The objective of this research is to evaluate a conceptual method for determination of contract time using linear regression and the predictive quality of such method based on different project types. A predictive conceptual method will serve a purpose, especially when there is not enough time or information to develop a detailed schedule. The development of a linear regression based on Bromilow’s Time–Cost (BTC) model could enhance state department of transportation (DOT) ability to make informed decisions on project feasibility and contract time. The ability to make such decision could save the agencies time and money. Based on the projects evaluated, the findings indicate that contract value (amount paid at completion) alone is not a good indicator of the contract time. The research suggests that a better predictor of contract duration could be arrived using standardized project types. In addition to cost, such classification will include project dimensions such as construction type, system type, material type, project location, complexity category, traffic control category, environmental assessment, and other factors.
引用
收藏
页码:1057 / 1073
页数:16
相关论文
共 50 条
  • [2] Dynamic Contract Time Determination System for Highway Projects
    Abdel-Raheem, Mohamed
    Torres Cantu, Cuauhtemoc
    Wang, Xiaohui
    [J]. TRANSPORTATION RESEARCH RECORD, 2020, 2674 (05) : 381 - 392
  • [3] Automated contract time determination system for highway projects
    Jeong, Hyung Seok
    Atreya, Siddharth
    Oberlender, Garold D.
    Chung, BooYoung
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 957 - 965
  • [4] Complexity in the Evaluation of Contract Types Employed for the Construction of Highway Projects
    Antoniou, Fani
    Aretoulis, Georgios N.
    Konstantinidis, Dimitrios
    Kalfakakou, Glykeria P.
    [J]. SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 448 - 458
  • [5] Investigation of the Contract Time Determination Systems Used for Highway Projects in the USA
    Abdel-Raheem, Mohamed
    Reyes, Jennifer
    [J]. TRANSPORTATION RESEARCH RECORD, 2020, 2674 (10) : 715 - 728
  • [6] Determining minimum contract time for highway projects
    Shr, JF
    Thompson, BP
    Russell, JS
    Ran, B
    Tserng, HP
    [J]. CONSTRUCTION 2000: MATERIALS AND CONSTRUCTION, 2000, (1712): : 196 - 201
  • [7] Engineers' Perception of Contract Types' Performance for Highway Construction Projects
    Antoniou, Fani
    Aretoulis, Georgios N.
    Konstantinidis, Dimitrios
    Kalfakakou, Glykeria P.
    [J]. INTERNATIONAL JOURNAL OF APPLIED BEHAVIORAL ECONOMICS, 2013, 2 (04) : 1 - 24
  • [8] Determining Highway Project Contract Time from Project Duration Estimates
    Le, Chau
    Jeong, H. David
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [9] Dimensions of Innovation in Project Delivery Method Selection for Highway Projects
    Demetracopoulou, Vassiliki
    O'Brien, William J.
    Khwaja, Nabeel
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 119 - 128
  • [10] A new conceptual method for project evaluation
    Hashemi, Seyed Zabihollah
    Sharifi, Azita Sherej
    Charrakh, Maryam
    [J]. ASIA LIFE SCIENCES, 2013, 22 (02): : 565 - 576