共 50 条
- [41] Scheduling evaluation in construction projects using the critical chain project management method [J]. INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
- [42] Evaluation of Highway Maintenance Machinery Configuration Based on Fuzzy Comprehensive Evaluation Method [J]. MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 319 - 324
- [44] The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2304 - +
- [45] Optimization of Highway Construction Quota Determination Method Based on Fuzzy Theory [J]. Journal of Engineering Science and Technology Review, 2022, 15 (03): : 46 - 54
- [47] Project Selection Method Based on Combination Evaluation [J]. MANUFACTURING, DESIGN SCIENCE AND INFORMATION ENGINEERING, VOLS I AND II, 2015, : 1172 - 1178
- [48] Project Selection Method Based on Combination Evaluation [J]. MANUFACTURING, DESIGN SCIENCE AND INFORMATION ENGINEERING, VOLS I AND II, 2015, : 1081 - 1089
- [49] Personal Data Determination Method Based On Blockchain Technology and Smart Contract [J]. 2020 4TH INTERNATIONAL CONFERENCE ON CRYPTOGRAPHY, SECURITY AND PRIVACY (ICCSP 2020), 2020, : 89 - 94