A SPLIT TASK SOLUTION FOR QUAY CRANE SCHEDULING PROBLEM IN MID-SIZE CONTAINER TERMINALS

被引:2
|
作者
Grubisic, Neven [1 ]
Dundovic, Cedomir [1 ]
Zuskin, Srdjan [2 ]
机构
[1] Univ Rijeka, Fac Maritime Studies, Dept Maritime Transportat, Studentska 2, HR-51000 Rijeka, Croatia
[2] Univ Rijeka, Fac Maritime Studies, Naut Dept, Studentska 2, HR-51000 Rijeka, Croatia
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2016年 / 23卷 / 06期
关键词
container ports; container terminal logistics; container terminal optimization; quay crane schedule; split task algorithm; tactical logistic problems; OPERATIONS; BERTH;
D O I
10.17559/TV-20150914110215
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A solution for quay crane scheduling problem with unchanged number of cranes during container vessel handling process is explored to minimize a vessel handling time and optimize quay crane utilization. Targets are small and mid-size terminals where high reliability of forecasted scenario is requested by the shipping companies while, at the same time, terminal resources are limited. Two models for the problem solution are proposed based on the full task and split task algorithms; in both cases grouping of tasks into clusters and operation zone limits are considered. Comparison of two models shows that split-task algorithm may improve crane utilization rate and vessel handling time in many cases. Proposed solutions combine existing research achievements with authors own approach in container terminal optimization development.
引用
收藏
页码:1723 / 1730
页数:8
相关论文
共 50 条
  • [31] A new solution approach for the twin yard crane scheduling problem in automated container terminals
    Oladugba, Andrew Omoniyi
    Gheith, Mohamed
    Eltawil, Amr
    ADVANCED ENGINEERING INFORMATICS, 2023, 57
  • [32] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [33] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
    Kizilay, Damla
    Eliiyi, Deniz Tursel
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2021, 33 (01) : 1 - 42
  • [34] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
    Damla Kizilay
    Deniz Türsel Eliiyi
    Flexible Services and Manufacturing Journal, 2021, 33 : 1 - 42
  • [35] Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
    Liu, JY
    Wan, YW
    Wang, L
    NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 60 - 74
  • [36] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [37] Modeling and solution of the joint quay crane and truck scheduling problem
    Tang, Lixin
    Zhao, Jiao
    Liu, Jiyin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (03) : 978 - 990
  • [38] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59
  • [39] A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 675 - 689
  • [40] Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal
    Azza, Lajjam
    El Merouani, Mohamed
    Medouri, Adbdellatif
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 176 - 180