A SPLIT TASK SOLUTION FOR QUAY CRANE SCHEDULING PROBLEM IN MID-SIZE CONTAINER TERMINALS

被引:2
|
作者
Grubisic, Neven [1 ]
Dundovic, Cedomir [1 ]
Zuskin, Srdjan [2 ]
机构
[1] Univ Rijeka, Fac Maritime Studies, Dept Maritime Transportat, Studentska 2, HR-51000 Rijeka, Croatia
[2] Univ Rijeka, Fac Maritime Studies, Naut Dept, Studentska 2, HR-51000 Rijeka, Croatia
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2016年 / 23卷 / 06期
关键词
container ports; container terminal logistics; container terminal optimization; quay crane schedule; split task algorithm; tactical logistic problems; OPERATIONS; BERTH;
D O I
10.17559/TV-20150914110215
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A solution for quay crane scheduling problem with unchanged number of cranes during container vessel handling process is explored to minimize a vessel handling time and optimize quay crane utilization. Targets are small and mid-size terminals where high reliability of forecasted scenario is requested by the shipping companies while, at the same time, terminal resources are limited. Two models for the problem solution are proposed based on the full task and split task algorithms; in both cases grouping of tasks into clusters and operation zone limits are considered. Comparison of two models shows that split-task algorithm may improve crane utilization rate and vessel handling time in many cases. Proposed solutions combine existing research achievements with authors own approach in container terminal optimization development.
引用
下载
收藏
页码:1723 / 1730
页数:8
相关论文
共 50 条
  • [21] An efficient heuristic algorithm for solving a multi-vessel quay crane scheduling problem in container terminals
    Ding, Yi
    Chen, Xiazhong
    Chen, Kaimin
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 16 (3-4) : 454 - 477
  • [22] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [23] Optimization Research of Joint Quay Crane Scheduling and Block Selection in Container Terminals
    Chen Xiazhong
    Zhang Ye
    Hu Hongtao
    2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,
  • [24] Quay crane scheduling with non-interference constraints in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    Miao, Lixin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (01) : 124 - 135
  • [25] Integrating optimization method for continuous berth and quay crane scheduling in container terminals
    Lu, Z.-Q. (zhiqianglu@tongji.edu.cn), 1600, Shanghai Jiaotong University (47):
  • [26] An approximation algorithm for quay crane scheduling with handling priority in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (12) : 1151 - 1161
  • [27] A quay crane scheduling method considering interference of yard cranes in container terminals
    Jung, Da Hun
    Park, Young-Man
    Lee, Byung Kwon
    Kim, Kap Hwan
    Ryu, Kwang Ryel
    MICAI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4293 : 461 - +
  • [28] Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
    Behjat, S.
    Nahavandi, N.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (09): : 1751 - 1758
  • [29] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [30] Examination of the Effectiveness and Robustness of the Heuristics for Bay-based Quay Crane Scheduling Problem in Port Container Terminals
    Chen, J. H.
    Zhang, S. X.
    Lee, D. H.
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1284 - 1288