共 50 条
- [1] Scheduling of Quay Crane at Container Terminals based on Ant Colony Algorithm [J]. 2011 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE (ICMI 2011), PT 2, 2011, 4 : 586 - 592
- [3] THE QUAY CRANE DEPLOYMENT PROBLEM AT A MARITIME CONTAINER TERMINAL [J]. 22ND EUROPEAN CONFERENCE ON MODELLING AND SIMULATION, PROCEEDINGS, 2008, : 53 - +
- [8] Quay crane scheduling in container terminals [J]. ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
- [10] Solving for a Quay Crane Scheduling and Assignment Problem by Simulated Annealing [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 326 - 333