Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal

被引:0
|
作者
Azza, Lajjam [1 ]
El Merouani, Mohamed [1 ]
Medouri, Adbdellatif [1 ]
机构
[1] Coll Sci, Tetouan 93002, Morocco
关键词
Quay crane scheduling; ant colony optimization; mathematical formulation; container terminal; OPTIMIZATION; ALGORITHM; BRANCH;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Quay Crane Scheduling Problem (QCSP) is one of the most important issues treated in container terminals because of its influence on the efficiency of port. The main goal behind this planning problem is to find the handling sequence of tasks at ship bays by a set of cranes assigned to a container vessel such that the time spent by vessels at berth is minimized. This study focused on optimizing quay crane scheduling in port container terminal to enhance their efficiency. So we provide a mixed-integer programming (MIP) model that takes into account non-crossing constraints, safety margin constraints and precedence constraints. To give a solution to this problem, we used a probabilistic technique for solving computational problems; this optimization methodology based on ant behaviors is named the Ant Colony Optimization (ACO).
引用
收藏
页码:176 / 180
页数:5
相关论文
共 50 条
  • [31] A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows
    Narges Kaveshgar
    Nathan Huynh
    [J]. Maritime Economics & Logistics, 2015, 17 : 515 - 537
  • [32] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [33] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [34] An Estimation of Distribution Algorithm for Solving the Quay Crane Scheduling Problem with Availability Constraints
    Exposito Izquierdo, Christopher
    Melian Batista, Belen
    Marcos Moreno Vega, J.
    [J]. ADVANCES IN KNOWLEDGE-BASED AND INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, 2012, 243 : 10 - 19
  • [35] Solving methods for the quay crane scheduling problem at port of Tripoli-Lebanon
    Skaf, Ali
    Lamrous, Sid
    Hammoudan, Zakaria
    Manier, Marie-Ange
    [J]. RAIRO-OPERATIONS RESEARCH, 2021, 55 (01) : 115 - 133
  • [36] A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows
    Kaveshgar, Narges
    Huynh, Nathan
    [J]. MARITIME ECONOMICS & LOGISTICS, 2015, 17 (04) : 515 - 537
  • [37] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [38] Ant Colony System algorithm solving a Thermal Generator Maintenance Scheduling Problem
    Vlachos, Aristidis
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2013, 24 (04) : 713 - 723
  • [39] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    [J]. PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258
  • [40] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69