High voltage power supply for steady state operation of the neutral beam test facility ELISE

被引:4
|
作者
Peglau, Matthias [1 ]
Schmidt, Alexander Benjamin [1 ]
Koerner, Frederik [1 ]
Fantz, Ursel [1 ]
Heinemann, Bernd [1 ]
Haindl, Christoph [1 ]
Kaesemann, Claus-Peter [1 ]
Oswald, Alexander [1 ]
Riedl, Rudolf [1 ]
Wuenderlich, Dirk [1 ]
机构
[1] Max Planck Inst Plasma Phys, Boltzmannstr 2, D-85748 Garching, Germany
关键词
High voltage dc power supply; IGBT; Pulse step modulation; PSM; Neutral beam injection; ELISE; Negative ion source;
D O I
10.1016/j.fusengdes.2022.113382
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Neutral Beam Injection (NBI) system of ITER shall provide 33 MW heating power to the plasma for up to one hour by two injectors. The beam lines will be based on large RF-driven sources for negative hydrogen or deuterium ions. The test facility ELISE (Extraction from a Large Ion Source Experiment) at IPP Garching is supporting the ion source development for ITER with an ion source of 1 x 1 m(2) (half the size of the ITER source). While plasma operation of ELISE is possible for up to one hour, the extraction and acceleration of a negative ion beam (up to 60 kV) was initially possible only for X10 s every X150 s with the old power supply. During such pulses the temporal behavior of the co-extracted electrons significantly depends on whether beam extraction is switched on or off. Thus, continuous wave (CW) extraction is mandatory for developing fully ITER relevant operational scenarios and recently, a steady state power supply for beam extraction has been installed at ELISE. This power supply consists of two stages connected in series: a first stage with 12 kV / 70 A, providing 35 A for the extracted negative ion current, with a 35 A overhead for co-extracted electrons. The second stage of 50 kV / 35 A is used for the further acceleration of only the ions to a total potential of 60 kV. The two stages have an electrical active power of 1.75 MW and 0.84 MW respectively. The power supply operates with pulse step modulation. Bipolar transistors with insulated gate electrodes (IGBT) are used as electrical switches on the DC side. The 50 kV stage consists of 64 modules in series and the 12 kV stage has 24 modules. Both stages are controlled synchronously and must detect breakdowns between the grids in a mu s range.
引用
收藏
页数:5
相关论文
共 50 条
  • [41] Tritium monitoring in the ITER neutral beam test facility
    Loughlin, M. J.
    Lawrence, G.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 646 - 651
  • [42] Progress in the realization of the PRIMA neutral beam test facility
    Toigo, V.
    Boilson, D.
    Bonicelli, T.
    Piovan, R.
    Hanada, M.
    Chakraborty, A.
    Agarici, G.
    Antoni, V.
    Baruah, U.
    Bigi, M.
    Chitarin, G.
    Dal Bello, S.
    Decamps, H.
    Graceffa, J.
    Kashiwagi, M.
    Hemsworth, R.
    Luchetta, A.
    Marcuzzi, D.
    Masiello, A.
    Paolucci, F.
    Pasqualotto, R.
    Patel, H.
    Pomaro, N.
    Rotti, C.
    Serianni, G.
    Simon, M.
    Singh, M.
    Singh, N. P.
    Svensson, L.
    Tobari, H.
    Watanabe, K.
    Zaccaria, P.
    Agostinetti, P.
    Agostini, M.
    Andreani, R.
    Aprile, D.
    Bandyopadhyay, M.
    Barbisan, M.
    Battistella, M.
    Bettini, P.
    Blatchford, P.
    Boldrin, M.
    Bonomo, F.
    Bragulat, E.
    Brombin, M.
    Cavenago, M.
    Chuilon, B.
    Coniglio, A.
    Croci, G.
    Dalla Palma, M.
    NUCLEAR FUSION, 2015, 55 (08)
  • [43] Overview of Instrumentation and Control in the Neutral Beam Test Facility
    Luchetta, A.
    Manduchi, G.
    Taliercio, C.
    Rigoni, A.
    Pomaro, N.
    Moressa, M.
    Dal Bello, S.
    Grando, L.
    Battistella, M.
    Paolucci, F.
    Labate, C.
    2017 EUROPEAN CONFERENCE ON CIRCUIT THEORY AND DESIGN (ECCTD), 2017,
  • [44] 130 kV 130 A High voltage switching mode power supply for neutral beam plasma heating:: design issues
    Ganuza, D
    Del Río, JM
    García, I
    García, F
    de Madinabeitia, PG
    Perez, A
    Zabaleta, JR
    FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 615 - 620
  • [45] 130 kV 130 A high voltage switching mode power supply for neutral beam injectors -: Control issues and algorithms
    Ganuza, D
    García, F
    Zulaika, M
    Perez, A
    Jones, TTC
    FUSION ENGINEERING AND DESIGN, 2005, 75-79 : 253 - 258
  • [46] Steady state high power test system at 3.7 GHz
    Bora, D
    Dani, S
    Gangopadhyay, S
    Jadav, B
    Jha, M
    Kadia, BR
    Khilar, PL
    Kulkarni, SV
    Kushwah, M
    Patel, AP
    Parmar, KG
    Parmar, KM
    Parmar, P
    Rajnish, K
    Raghuraj, S
    Rao, SL
    Samanta, KK
    Sathyanarayana, K
    Shah, P
    Sharma, PK
    Srinivas, YSS
    Trivedi, RG
    Verghese, G
    FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 575 - 579
  • [47] Commissioning and first results of the ITER-relevant negative ion beam test facility ELISE
    Franzen, P.
    Heinemann, B.
    Fantz, U.
    Wuenderlich, D.
    Kraus, W.
    Froeschle, M.
    Martens, C.
    Riedl, R.
    Nocentini, R.
    Masiello, A.
    Ruf, B.
    Schiesko, L.
    Wimmer, C.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (12) : 3132 - 3140
  • [48] Assessment of Electric Power System Operation in Terms of Steady-State Voltage Stability
    Veleba, Jan
    Nohacova, Lucie
    PROCEEDINGS OF THE 12TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2011, 2011, : 41 - 44
  • [49] HIGH POWER HEATING AND STEADY STATE OPERATION IN THE LARGE HELICAL DEVICE
    Mutoh, T.
    Nagaoka, K.
    Takahashi, H.
    Kasahara, H.
    Osakabe, M.
    Kubo, S.
    Shimozuma, T.
    Yoshimura, Y.
    Tsumori, K.
    Seki, T.
    Saito, K.
    Igami, H.
    Nakano, H.
    Ikeda, K.
    Kisaki, M.
    Seki, R.
    Kamio, S.
    Ii, T.
    Nakamura, Y.
    Takeiri, Y.
    Kaneko, O.
    FUSION SCIENCE AND TECHNOLOGY, 2015, 68 (02) : 216 - 224
  • [50] Construction of a High Voltage Test Facility
    McDermid, W.
    Lambert, J. G.
    2012 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D), 2012,