High voltage power supply for steady state operation of the neutral beam test facility ELISE

被引:4
|
作者
Peglau, Matthias [1 ]
Schmidt, Alexander Benjamin [1 ]
Koerner, Frederik [1 ]
Fantz, Ursel [1 ]
Heinemann, Bernd [1 ]
Haindl, Christoph [1 ]
Kaesemann, Claus-Peter [1 ]
Oswald, Alexander [1 ]
Riedl, Rudolf [1 ]
Wuenderlich, Dirk [1 ]
机构
[1] Max Planck Inst Plasma Phys, Boltzmannstr 2, D-85748 Garching, Germany
关键词
High voltage dc power supply; IGBT; Pulse step modulation; PSM; Neutral beam injection; ELISE; Negative ion source;
D O I
10.1016/j.fusengdes.2022.113382
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Neutral Beam Injection (NBI) system of ITER shall provide 33 MW heating power to the plasma for up to one hour by two injectors. The beam lines will be based on large RF-driven sources for negative hydrogen or deuterium ions. The test facility ELISE (Extraction from a Large Ion Source Experiment) at IPP Garching is supporting the ion source development for ITER with an ion source of 1 x 1 m(2) (half the size of the ITER source). While plasma operation of ELISE is possible for up to one hour, the extraction and acceleration of a negative ion beam (up to 60 kV) was initially possible only for X10 s every X150 s with the old power supply. During such pulses the temporal behavior of the co-extracted electrons significantly depends on whether beam extraction is switched on or off. Thus, continuous wave (CW) extraction is mandatory for developing fully ITER relevant operational scenarios and recently, a steady state power supply for beam extraction has been installed at ELISE. This power supply consists of two stages connected in series: a first stage with 12 kV / 70 A, providing 35 A for the extracted negative ion current, with a 35 A overhead for co-extracted electrons. The second stage of 50 kV / 35 A is used for the further acceleration of only the ions to a total potential of 60 kV. The two stages have an electrical active power of 1.75 MW and 0.84 MW respectively. The power supply operates with pulse step modulation. Bipolar transistors with insulated gate electrodes (IGBT) are used as electrical switches on the DC side. The 50 kV stage consists of 64 modules in series and the 12 kV stage has 24 modules. Both stages are controlled synchronously and must detect breakdowns between the grids in a mu s range.
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Diagnostics of the ITER neutral beam test facility
    Pasqualotto, R.
    Serianni, G.
    Sonato, P.
    Agostini, M.
    Brombin, M.
    Croci, G.
    Dalla Palma, M.
    De Muri, M.
    Gazza, E.
    Gorini, G.
    Pomaro, N.
    Rizzolo, A.
    Spolaore, M.
    Zaniol, B.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2012, 83 (02):
  • [32] Progress in the ITER neutral beam test facility
    Toigo, V
    Dal Bello, S.
    Bigi, M.
    Boldrin, M.
    Chitarin, G.
    Grando, L.
    Luchetta, A.
    Marcuzzi, D.
    Pasqualotto, R.
    Pomaro, N.
    Serianni, G.
    Zaccaria, P.
    Zanotto, L.
    Agostinetti, P.
    Agostini, M.
    Antoni, V
    Aprile, D.
    Barbisan, M.
    Battistella, M.
    Brombin, M.
    Cavazzana, R.
    Dalla Palma, M.
    Dan, M.
    Denizeau, S.
    De Lorenzi, A.
    Delogu, R.
    De Muri, M.
    Fadone, M.
    Fellin, F.
    Ferro, A.
    Fiorentin, A.
    Gaio, E.
    Gambetta, G.
    Gasparini, F.
    Gnesotto, F.
    Jain, P.
    Maistrello, A.
    Manduchi, G.
    Manfrin, S.
    Marchiori, G.
    Marconato, N.
    Moresco, M.
    Ocello, E.
    Patton, T.
    Pavei, M.
    Peruzzo, S.
    Pilan, N.
    Pimazzoni, A.
    Piovan, R.
    Poggi, C.
    NUCLEAR FUSION, 2019, 59 (08)
  • [34] HIGH-VOLTAGE SUPPLY FOR NEUTRAL BEAM INJECTION IN THE TOKAMAK EXPERIMENT TEXTOR
    BOKSBERGER, HU
    SCHWARZ, U
    BROWN BOVERI REVIEW, 1986, 73 (05): : 231 - 234
  • [35] Implementation of a High Voltage Power Supply for Underground Cable Test
    Vasile, Moise Madalin
    Sebastian, Nedelcu Bogdan
    2022 IEEE 9TH ELECTRONICS SYSTEM-INTEGRATION TECHNOLOGY CONFERENCE, ESTC, 2022, : 452 - 455
  • [36] Test wire for high voltage power supply crowbar system
    Bradley, JT
    Collins, M
    11TH IEEE INTERNATIONAL PULSED POWER CONFERENCE - DIGEST OF TECHNICAL PAPERS, VOLS. 1 & 2, 1997, : 1719 - 1724
  • [37] Maintenance schemes for the ITER neutral beam test facility
    Zaccaria, P
    Dal Bello, S
    Marcuzzi, D
    Masiello, A
    Cordier, JJ
    Hemsworth, R
    Antipenkov, A
    Day, C
    Dremel, M
    Mack, A
    Jones, T
    Coniglio, A
    Pillon, M
    Sandri, S
    Speth, E
    Tanga, A
    Antoni, V
    Di Pietro, E
    Mondino, PL
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 255 - 259
  • [38] Cryosorption pumps for a neutral beam injector test facility
    Dremel, M.
    Mack, A.
    Day, C.
    Jensen, H.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 51A AND B, 2006, 823 : 583 - +
  • [39] Safety systems in the ITER neutral beam test facility
    Dal Bello, Samuele
    Battistella, Manuela
    Grando, Luca
    Luchetta, Adriano
    Moressa, Modesto
    Breda, Mauro
    Svensson, Lennart
    Paolucci, Francesco
    Labate, Carmelo Vincenzo
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 246 - 249
  • [40] NEUTRAL BEAM TEST FACILITY AT BROOKHAVEN NATIONAL LABORATORY
    MCKENZIEWILSON, RB
    VELIGDAN, JT
    ACQUISITION, TRACKING, AND POINTING III, 1989, 1111 : 160 - 169