High voltage power supply for steady state operation of the neutral beam test facility ELISE

被引:4
|
作者
Peglau, Matthias [1 ]
Schmidt, Alexander Benjamin [1 ]
Koerner, Frederik [1 ]
Fantz, Ursel [1 ]
Heinemann, Bernd [1 ]
Haindl, Christoph [1 ]
Kaesemann, Claus-Peter [1 ]
Oswald, Alexander [1 ]
Riedl, Rudolf [1 ]
Wuenderlich, Dirk [1 ]
机构
[1] Max Planck Inst Plasma Phys, Boltzmannstr 2, D-85748 Garching, Germany
关键词
High voltage dc power supply; IGBT; Pulse step modulation; PSM; Neutral beam injection; ELISE; Negative ion source;
D O I
10.1016/j.fusengdes.2022.113382
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Neutral Beam Injection (NBI) system of ITER shall provide 33 MW heating power to the plasma for up to one hour by two injectors. The beam lines will be based on large RF-driven sources for negative hydrogen or deuterium ions. The test facility ELISE (Extraction from a Large Ion Source Experiment) at IPP Garching is supporting the ion source development for ITER with an ion source of 1 x 1 m(2) (half the size of the ITER source). While plasma operation of ELISE is possible for up to one hour, the extraction and acceleration of a negative ion beam (up to 60 kV) was initially possible only for X10 s every X150 s with the old power supply. During such pulses the temporal behavior of the co-extracted electrons significantly depends on whether beam extraction is switched on or off. Thus, continuous wave (CW) extraction is mandatory for developing fully ITER relevant operational scenarios and recently, a steady state power supply for beam extraction has been installed at ELISE. This power supply consists of two stages connected in series: a first stage with 12 kV / 70 A, providing 35 A for the extracted negative ion current, with a 35 A overhead for co-extracted electrons. The second stage of 50 kV / 35 A is used for the further acceleration of only the ions to a total potential of 60 kV. The two stages have an electrical active power of 1.75 MW and 0.84 MW respectively. The power supply operates with pulse step modulation. Bipolar transistors with insulated gate electrodes (IGBT) are used as electrical switches on the DC side. The 50 kV stage consists of 64 modules in series and the 12 kV stage has 24 modules. Both stages are controlled synchronously and must detect breakdowns between the grids in a mu s range.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Long Pulse, High Power Operation of the ELISE Test Facility
    Wuenderlich, D.
    Kraus, W.
    Froeschle, M.
    Riedl, R.
    Fantz, U.
    Heinemann, B.
    FIFTH INTERNATIONAL SYMPOSIUM ON NEGATIVE IONS, BEAMS AND SOURCES (NIBS 2016), 2017, 1869
  • [2] A high-voltage power supply of the neutral beam injector
    V. V. Kolmogorov
    G. F. Abdrashitov
    Instruments and Experimental Techniques, 2009, 52 : 824 - 828
  • [3] A high-voltage power supply of the neutral beam injector
    Kolmogorov, V. V.
    Abdrashitov, G. F.
    INSTRUMENTS AND EXPERIMENTAL TECHNIQUES, 2009, 52 (06) : 824 - 828
  • [4] Neutron measurements from beam-target reactions at the ELISE neutral beam test facility
    Xufei, X.
    Nocente, M.
    Bonomo, F.
    Franzen, P.
    Froeschle, M.
    Grosso, G.
    Gruenauer, F.
    Pasqualotto, R.
    Tardocchi, M.
    Fan, T.
    Gorini, G.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2014, 85 (11):
  • [5] Experimental investigation of beam-target neutron emission at the ELISE neutral beam test facility
    Nocente, M.
    Feng, S.
    Wuenderlich, D.
    Bonomo, F.
    Croci, G.
    Fantz, U.
    Heinemann, B.
    Kraus, W.
    Mario, I.
    Pasqualotto, R.
    Tardocchi, M.
    Gorini, G.
    FUSION ENGINEERING AND DESIGN, 2017, 123 : 843 - 846
  • [6] Design of the "half-size" ITER neutral beam source for the test facility ELISE
    Heinemann, B.
    Falter, H.
    Fantza, U.
    Franzen, R.
    Froeschle, M.
    Gutser, R.
    Kraus, W.
    Nocentini, R.
    Riedl, R.
    Speth, E.
    Staebler, A.
    Wuenderlich, D.
    Agostinetti, P.
    Jiang, T.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 915 - 922
  • [7] Progress of the ELISE test facility: results of caesium operation with low RF power
    Franzen, P.
    Fantz, U.
    Wuenderlich, D.
    Heinemann, B.
    Riedl, R.
    Kraus, W.
    Froeschle, M.
    Ruf, B.
    Nocentini, R.
    NUCLEAR FUSION, 2015, 55 (05)
  • [8] HVPTF-The high voltage laboratory for the ITER Neutral Beam test facility
    De Lorenzi, A.
    Pilan, N.
    Lotto, L.
    Fincato, M.
    Pesavento, G.
    Gobbo, R.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 742 - 745
  • [9] Wireless parallel operation of high voltage DC power supply using steady-state estimation
    Baek, J. W.
    Ryu, M. H.
    Yoo, D. W.
    Rim, G. H.
    IECON 2004: 30TH ANNUAL CONFERENCE OF IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOL 2, 2004, : 1856 - 1860
  • [10] Neutron measurements at the ELISE neutral beam test facility and implications for neutron based diagnostics at SPIDER
    Feng, S.
    Nocente, M.
    Wuenderlich, D.
    Bonomo, F.
    Croci, G.
    Fantz, U.
    Heinemann, B.
    Kraus, W.
    Mario, I.
    Muraro, A.
    Pasqualotto, R.
    Rebai, M.
    Tardocchi, M.
    Gorini, G.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2018, 89 (10):