An FPTAS for scheduling with resource constraints

被引:0
|
作者
Chen, Bo [1 ]
Strusevich, Vitaly A. [2 ]
机构
[1] Univ Warwick, Warwick Business Sch, Coventry CV4 7AL, England
[2] Sherwood Rd, Kent, England
关键词
Scheduling; Approximation; Resource constraint; OPEN SHOP; APPROXIMATION; MINIMIZE; CLASSIFICATION;
D O I
10.1016/j.orl.2023.06.001
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study a basic scheduling problem with resource constraints: A number of jobs need to be scheduled on two parallel identical machines with the objective of minimizing the makespan, subject to the constraint that jobs may require a unit of one of the given renewable resources during their execution. For this NP-hard problem, we develop a fully polynomial-time approximation scheme (FPTAS). Our FPTAS makes a novel use of existing algorithms for the subset-sum problem and the open shop scheduling problem. & COPY; 2023 The Author(s). Published by Elsevier B.V. This is an open access article under the CC BY license (http://creativecommons .org /licenses /by /4 .0/).
引用
收藏
页码:421 / 424
页数:4
相关论文
共 50 条
  • [31] Resource continuity constraints in repetitive project scheduling
    Wang, W. (xiaoxin301@126.com), 2013, Binary Information Press, Flat F 8th Floor, Block 3, Tanner Garden, 18 Tanner Road, Hong Kong (10):
  • [32] CRITICAL PATH SCHEDULING WITH RESOURCE AND PROCESSOR CONSTRAINTS
    LLOYD, EL
    JOURNAL OF THE ACM, 1982, 29 (03) : 781 - 811
  • [33] Scheduling of deconstruction projects under resource constraints
    Schultmann, Frank
    Rentz, Otto
    Construction Management and Economics, 2002, 20 (05) : 391 - 401
  • [34] ONE-MACHINE SCHEDULING PROBLEMS WITH RESOURCE CONSTRAINTS
    JANIAK, A
    LECTURE NOTES IN CONTROL AND INFORMATION SCIENCES, 1986, 84 : 358 - 364
  • [35] Project scheduling with time-varying resource constraints
    Klein, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (16) : 3937 - 3952
  • [36] Controlled spectrum sensing and scheduling under resource constraints
    Michelusi, Nicolo
    Mitra, Urbashi
    24TH INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATIONS AND NETWORKS ICCCN 2015, 2015,
  • [37] Metro Maintenance Tasks Scheduling Considering Resource Constraints
    Luo Q.
    Huang S.
    Song J.
    Zeng C.
    Chen J.
    Li W.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2024, 24 (02): : 188 - 198
  • [38] CRITCAL PATH SCHEDULING WITH RESOURCE AND PROCESSOR CONSTRAINTS.
    Lloyd, Errol L.
    1600, (29):
  • [39] DEADLINE SCHEDULING OF TASKS WITH READY TIMES AND RESOURCE CONSTRAINTS
    BLAZEWICZ, J
    INFORMATION PROCESSING LETTERS, 1979, 8 (02) : 60 - 63
  • [40] Solving the project scheduling problem with dependent resource constraints
    Lin, Chun-Wei R.
    Lai, Yung Sheng
    Jeng, Shiou-Yun
    Hsiau, Hsian-Jong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2025, 42 (01) : 30 - 46