An FPTAS for scheduling with resource constraints

被引:0
|
作者
Chen, Bo [1 ]
Strusevich, Vitaly A. [2 ]
机构
[1] Univ Warwick, Warwick Business Sch, Coventry CV4 7AL, England
[2] Sherwood Rd, Kent, England
关键词
Scheduling; Approximation; Resource constraint; OPEN SHOP; APPROXIMATION; MINIMIZE; CLASSIFICATION;
D O I
10.1016/j.orl.2023.06.001
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study a basic scheduling problem with resource constraints: A number of jobs need to be scheduled on two parallel identical machines with the objective of minimizing the makespan, subject to the constraint that jobs may require a unit of one of the given renewable resources during their execution. For this NP-hard problem, we develop a fully polynomial-time approximation scheme (FPTAS). Our FPTAS makes a novel use of existing algorithms for the subset-sum problem and the open shop scheduling problem. & COPY; 2023 The Author(s). Published by Elsevier B.V. This is an open access article under the CC BY license (http://creativecommons .org /licenses /by /4 .0/).
引用
收藏
页码:421 / 424
页数:4
相关论文
共 50 条
  • [41] Efficient method for scheduling construction projects with resource constraints
    Abeyasinghe, M.Chelaka L.
    Greenwood, David J.
    Johansen, D.Eric
    2001, Elsevier Science Ltd, Exeter, United Kingdom (19)
  • [42] A HEURISTIC SCHEDULING OF INDEPENDENT TASKS WITH BOTTLENECK RESOURCE CONSTRAINTS
    WANG, QZ
    LEISS, EL
    SIAM JOURNAL ON COMPUTING, 1995, 24 (02) : 235 - 241
  • [43] Project scheduling under partially renewable resource constraints
    Böttcher, J
    Drexl, A
    Kolisch, R
    Salewski, F
    MANAGEMENT SCIENCE, 1999, 45 (04) : 543 - 559
  • [44] Unrelated parallel machine scheduling with secondary resource constraints
    Chen, JF
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (03): : 285 - 292
  • [45] Resource constraints machine scheduling: A genetic algorithm approach
    Li, YZ
    Wang, F
    Lim, A
    CEC: 2003 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-4, PROCEEDINGS, 2003, : 1080 - 1085
  • [46] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH
    CHRISTOFIDES, N
    ALVAREZVALDES, R
    TAMARIT, JM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) : 262 - 273
  • [47] Parallel machine scheduling subject to auxiliary resource constraints
    Cakici, E.
    Mason, S. J.
    PRODUCTION PLANNING & CONTROL, 2007, 18 (03) : 217 - 225
  • [48] Scheduling Optimization of Prefabricated Buildings under Resource Constraints
    Wei He
    Wenjing Li
    Xiaofeng Meng
    KSCE Journal of Civil Engineering, 2021, 25 : 4507 - 4519
  • [49] Scheduling of uniform multidimensional systems under resource constraints
    Passos, NL
    Sha, EHM
    IEEE TRANSACTIONS ON VERY LARGE SCALE INTEGRATION (VLSI) SYSTEMS, 1998, 6 (04) : 719 - 730
  • [50] A decentralized scheduling method for flowshop problems with resource constraints
    Nishi, T
    Konishi, M
    Hasebe, S
    ELECTRICAL ENGINEERING IN JAPAN, 2004, 149 (01) : 44 - 51