Failure experiment on CFRP-strengthened prestressed concrete cylinder pipe with broken wires

被引:20
|
作者
Zhai, Kejie [1 ,2 ]
Fang, Hongyuan [1 ]
Li, Bin [1 ]
Guo, Chengchao [2 ]
Yang, Kangjian [1 ]
Du, Xueming [1 ]
Du, Mingrui [1 ]
Wang, Niannian [1 ]
机构
[1] Zhengzhou Univ, Yellow River Lab, Zhengzhou 450001, Peoples R China
[2] Sun Yat Sen Univ, Sch Civil Engn, Guangzhou 510275, Peoples R China
基金
中国国家自然科学基金;
关键词
Prestressed concrete cylinder pipe (PCCP); Broken wires; Carbon fiber reinforced polymer (CFRP); Strain gauging; Failure experiment; COATING DELAMINATION; RADIAL TENSION; PERFORMANCE; PCCP;
D O I
10.1016/j.tust.2023.105032
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The prestressed concrete cylinder pipe (PCCP) has been used widely in hydraulic engineering. However, due to hydrogen embrittlement and corrosion, the prestressing wires in PCCP can break and cause pipe failure. In this study, a retrofitting technique of using externally bonded carbon fiber reinforced polymer (CFRP) to repair PCCP was proposed. The technique is particularly useful when shutting down water is not possible. The proposed strategy was evaluated by using a full-scale PCCP with a 2.8 m inside diameter loaded with internal water pressure. First, the PCCP strains before and after repair were compared under different internal pressures. In the presence of CFRP, the strains near the broken wires significantly decreased under the same internal pressure, and the carrying capacity of the PCCP increased. PCCPs with 13 %, 15 %, and 18 % wire breakage ratios were then evaluated and compared. The strain in each material increased with increasing wire breakage ratio, and the maximum strain in CFRP was observed at the location of wire breakage. Considering the PCCP with 18 % wire breakage ratio, the section 2300 mm from the pipe end was in the linear state under an internal pressure of 0-0.9 MPa, and the PCCP reached its serviceability and elastic limit states when the internal pressure increased to about 1.0 MPa and 1.2 MPa, respectively. Finally, when the internal water pressure was increased to 1.27 MPa, which was higher than the internal design pressure of 1.12 MPa, the PCCP failed due to the rupture of CFRP.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Acoustic monitoring of Prestressed Concrete Cylinder Pipe
    Holley, M
    Rittenhouse, S
    PIPELINE SAFETY, RELIABILITY, AND REHABILITATION, 1999, : 219 - 229
  • [32] The Development of Prestressed Concrete Cylinder Pipe in China
    Zhang Hongyu
    Peng Hua
    Chen Xiang
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2363 - 2366
  • [33] Acoustic monitoring of prestressed concrete cylinder pipe
    Holley, M
    Buchanan, D
    PIPELINES IN THE CONSTRUCTED ENVIRONMENT, 1998, : 468 - 476
  • [34] Corrosion control of prestressed concrete cylinder pipe
    Hall, SC
    PIPELINES IN THE CONSTRUCTED ENVIRONMENT, 1998, : 356 - 366
  • [35] Durability of CFRP-strengthened concrete members under extreme temperature and humidity
    Gamage, J.
    Al-Mahaidi, R.
    Wong, M.
    AUSTRALIAN JOURNAL OF STRUCTURAL ENGINEERING, 2009, 9 (02) : 111 - 118
  • [36] Time-dependent behaviour of CFRP-strengthened reinforced concrete beams
    Kaminski, M.
    Kusa, E.
    Demski, D.
    CONCRETE SOLUTIONS, 2012, : 697 - 704
  • [37] Fatigue Behavior and Prediction of NSM CFRP-Strengthened Reinforced Concrete Beams
    Chen, Cheng
    Cheng, Lijuan
    JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2016, 20 (05)
  • [38] Performance of Postcured CFRP-Strengthened Reinforced Concrete Beams at Elevated Temperatures
    Shier, G. W. R.
    Green, M. F.
    JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2017, 21 (04)
  • [39] Effect of shear-to-flexural strength ratio on debonding failure in CFRP-strengthened reinforced concrete seams
    Li, Gui-Bing
    STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 1188 - 1194
  • [40] Flexural Tests for Efficiency Evaluation of Spike Anchors on CFRP-Strengthened Concrete
    Llaurado, Paula Villanueva
    Porres, Rafael Cascon
    Blazquez, Alberto Sanchidrian
    Olalla, Francisco Santos
    alvarez, Fernando Gomez
    MATERIALS, 2023, 16 (01)