Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants

被引:5
|
作者
Trach, Roman [1 ,2 ]
Khomenko, Oleksandr [3 ]
Trach, Yuliia [1 ,2 ]
Kulikov, Oleksii [4 ]
Druzhynin, Maksym [3 ]
Kishchak, Nataliia [3 ]
Ryzhakova, Galyna [3 ]
Petrenko, Hanna [3 ]
Prykhodko, Dmytro [3 ]
Obodianska, Olha [5 ]
机构
[1] Warsaw Univ Life Sci, Inst Civil Engn, PL-02776 Warsaw, Poland
[2] Natl Univ Water & Environm Engn, Inst Civil Engn & Architecture, UA-33028 Rivne, Ukraine
[3] Kyiv Natl Univ Construct & Architecture, Dept Management Construct, UA-03037 Kiev, Ukraine
[4] State Univ Trade & Econ, Dept Int Civil & Commercial Law, UA-02156 Kiev, Ukraine
[5] Kyiv Natl Univ Construct & Architecture, Dept Construct & Informat Technol, UA-03037 Kiev, Ukraine
关键词
centrality measures; communication; construction projects; social network analysis; fuzzy logic; SELF-ORGANIZING NETWORKS; TEAM; CENTRALITY; IMPACT; PERFORMANCE; SYSTEMS;
D O I
10.3390/su15075653
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The purpose of this research is to study the communication network among the participants in a construction project. The proposed approach contains the solving of the following tasks: identification of the key factors that affect the communication quality; calculation of the "communication quality" indicator between each pair of participants using fuzzy logic; and evaluation of the key measures of centrality using the tools of a Social Network Analysis. Solving the set tasks can help break the problem of the low level of efficiency of construction project deliveries. This study was conducted when the design stage was already complete and the construction project had 17 participants. We used the following factors influencing communication quality: timeliness, understanding, bidirectionality, use of IT tools in communication acts and adequacy. The use of fuzzy logic tools can minimise the subjectivity of the qualitative data obtained from the questionnaires. The analysis of five centrality measures showed that "Project manager", "Chief engineer", "Construction site manager", "Construction works manager" and "Architect" had the greatest values in comparison with other network participants. On the one hand, this organisational structure of communication can be considered correct because the main information flows through the project managers, who make the decisions. On the other hand, this indicates a significant dependence of the construction project on these participants and, in the event of certain risk events, may lead to a decrease in the efficiency of its implementation. The methods presented in this article can be used in project management to analyse a real communication network.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] An Application of Fuzzy Logic to Strategic Environmental Assessment
    Gavanelli, Marco
    Riguzzi, Fabrizio
    Milano, Michela
    Sottara, Davide
    Cangini, Alessandro
    Cagnoli, Paolo
    AI(STAR)IA 2011: ARTIFICIAL INTELLIGENCE AROUND MAN AND BEYOND, 2011, 6934 : 324 - +
  • [22] APPLICATION OF FUZZY LOGIC IN THE QUALITY OF A FUZZY IN IDENTIFYING A DYNAMIC TARGET
    Kostova, Milena
    AEROSPACE RESEARCH IN BULGARIA, 2007, 21 : 150 - 166
  • [23] Application of PSO-based Neural Network in Quality Assessment of Construction Project
    Shi, Huawang
    Li, Wanqing
    2008 INTERNATIONAL CONFERENCE ON MULTIMEDIA AND INFORMATION TECHNOLOGY, PROCEEDINGS, 2008, : 54 - +
  • [24] Application of fuzzy logic to quality assessment of infrastructure projects at conceptual cost estimating stage
    Fayek, Aminah Robinson
    Rodriguez Flores, Jose Ruben
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (08) : 1137 - 1147
  • [25] Assessment of BIM Competencies and Correlation Analysis between Competencies and Career Characteristics of FAB Construction Project Participants
    Lee, Songyi
    Chung, Suwan
    Kwon, Soonwook
    Cho, Chung-Suk
    Lee, Kyuhyup
    APPLIED SCIENCES-BASEL, 2021, 11 (18):
  • [26] Identification of factors influencing communication between participants in construction projects
    Liu, Yan
    Baldwin, Rew N.
    Shen, L. Y.
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 291 - 299
  • [27] Evaluations of Construction Project Participants' Attitudes Toward Quality Management in Turkey
    Acikara, Turgut
    Kazaz, Aynur
    Ulubeyli, Serdar
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 203 - 210
  • [28] Assessment of Project Management Implementation Based On Fuzzy Logic Approach
    Pislaru, Marius
    Alexa, Lidia
    Avasilcai, Silvia
    INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE THROUGH VISION 2020, VOLS I -XI, 2018, : 6079 - 6086
  • [29] PROJECT PRIORITIZING IN A MANUFACTURING - SERVICE ENTERPRISE WITH APPLICATION OF THE FUZZY LOGIC
    Marek-Kolodziej, Katarzyna
    Lapunka, Iwona
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2020, 11 (04) : 81 - 91
  • [30] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857