A fuzzy approach to construction project risk assessment and analysis: construction project risk management system

被引:184
|
作者
Carr, V [1 ]
Tah, JHM [1 ]
机构
[1] S Bank Univ, Sch Construct, Project Syst Engn Res Unit, London SW8 2JZ, England
基金
英国工程与自然科学研究理事会;
关键词
qualitative risk assessment and management; fuzzy logic; linguistic variables;
D O I
10.1016/S0965-9978(01)00036-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The construction industry is plagued by risk, and poor performance has often been the result. Although risk management techniques have been applied, the lack of a formalised approach has produced inconsistent results. In this paper, a hierarchical risk breakdown structure is described to represent a formal model for qualitative risk assessment. The relationships between risk factors, risks, and their consequences are represented on case and effect diagrams. Risk descriptions and their consequences can be defined using descriptive linguistic variables. Using fuzzy approximation and composition, the relationships between risk sources and the consequences on project performance measures can be identified and quantified consistently. (C) 2001 Civil-Comp Ltd and Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:847 / 857
页数:11
相关论文
共 50 条
  • [1] A fuzzy approach to construction project risk assessment
    Nieto-Morote, A.
    Ruz-Vila, F.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) : 220 - 231
  • [2] Fuzzy Based Risk Register for Construction Project Risk Assessment
    Kuchta, Dorota
    Ptaszynska, Ewa
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2016 (ICNAAM-2016), 2017, 1863
  • [3] Fuzzy Arithmetic Risk Analysis Approach to Determine Construction Project Contingency
    Elbarkouky, Mohamed M. G.
    Fayek, Aminah Robinson
    Siraj, Nasir B.
    Sadeghi, Naimeh
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (12)
  • [4] An analysis of IT applications in construction project risk management
    Sun, CS
    Gu, GC
    [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 766 - 768
  • [5] Risk Assessment in Construction Project Using Statistic Approach
    Dziadosz, Agnieszka
    Rejment, Mariusz
    [J]. INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS (ICNAAM-2018), 2019, 2116
  • [6] Risk Management in Highway Construction Project Based on Integrated Project Management System
    Jing Bingyin
    Jing Chunju
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
  • [7] A Novel Fuzzy Expert System for Project Portfolio Risk Management: Case of a Construction
    Ali Banihashemi, Sayyid
    Khalilzadeh, Mohammad
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (03) : 436 - 456
  • [8] Construction Project Risk Assessment Using Combined Fuzzy and FMEA
    Mohammadi, Amir
    Tavakolan, Mehdi
    [J]. PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 232 - 237
  • [9] A Fuzzy-based Risk Model for Construction Project Management
    Chaher, Zid
    Benseghir, Hocine
    Ibrahim, Abdullah
    Kabir, Muhammad Nomani
    [J]. 2018 IEEE CONFERENCE ON SYSTEMS, PROCESS AND CONTROL (ICSPC), 2018, : 129 - 134
  • [10] Construction Project Risk Assessment Model
    Zhang Su-xian
    Li Xiao-li
    [J]. PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 42 - 45