A Fuzzy-based Risk Model for Construction Project Management

被引:0
|
作者
Chaher, Zid [1 ]
Benseghir, Hocine [2 ]
Ibrahim, Abdullah [2 ]
Kabir, Muhammad Nomani [3 ]
机构
[1] Tun Hussein Onn Univ Malaysia, Fac Technol Management & Business, Batu Pahat, Johor, Malaysia
[2] Univ Malaysia Pahang, Fac Engn Technol, Gambang 26300, Kuantan, Malaysia
[3] Univ Malaysia Pahang, Fac Comp Syst & Software Engn, Gambang 26300, Kuantan, Malaysia
关键词
Component; Construction Project Management; Fuzzy Logic; Risk Analysis; Modeling and Simulation; SYSTEM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Construction industry involves complex and challenging process associated with the risk of injury, death and property loss. Experts from different departments work together to develop a good management system in order to successfully complete a construction project. This paper presents a model of risk analysis using fuzzy logic to assess the risk involved in construction projects. The uncertainties related to cost, time and quality in the project is handled by the fuzzy logic that is one of the methods dealing with uncertainties in risk analysis. The model was validated using a real project. The test results demonstrated the plausibility of the model for the risk analysis in a real scenario. Using this model, one can prioritize and rank all risk factors in a construction project. Thus, the project managers and leaders can appropriately take precautions to avoid the risk. The proposed model of fuzzy-based risk analysis simplifies the risk management process, which helps the decision makers and the experts to monitor and to control the project, and ultimately, to meet the satisfaction of stakeholders.
引用
收藏
页码:129 / 134
页数:6
相关论文
共 50 条
  • [1] A Fuzzy-Based Decision Support Model for Risk Maturity Evaluation of Construction Organizations
    Roghabadi, Mohammadjavad Arabpour
    Moselhi, Osama
    [J]. ALGORITHMS, 2020, 13 (05)
  • [2] Construction project proposal evaluation under uncertainty: A fuzzy-based approach
    Singh, Pushpinder
    Ruparathna, Rajeev
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (03) : 291 - 300
  • [3] An approach to a fuzzy-based decision support system for construction project teams
    Yang, HM
    Anumba, CJ
    [J]. ARTIFICIAL INTELLIGENCE APPLICATIONS IN CIVIL AND STRUCTURAL ENGINEERING, 1999, : 53 - 59
  • [4] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857
  • [5] Based on the Fuzzy Mathematics Model of Quality Management of Highway Construction Project
    Liu Bingquan
    Wen Fenghua
    Wang Yaozhong
    [J]. ADVANCES IN COMPUTER SCIENCE, ENVIRONMENT, ECOINFORMATICS, AND EDUCATION, PT III, 2011, 216 : 398 - +
  • [6] A fuzzy-based decision model application on strategic management
    Keropyan, Aras
    Maria Gil-Lafuente, Ana
    [J]. AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2011, 5 (15): : 6586 - 6590
  • [7] Towards the development of a comprehensive hybrid fuzzy-based occupational risk assessment model for construction workers
    Mohandes, Saeed Reza
    Zhang, Xueqing
    [J]. SAFETY SCIENCE, 2019, 115 : 294 - 309
  • [8] Developing a Fuzzy Based Decision Making Model for Risk Analysis in Construction Project
    Cebi, Selcuk
    [J]. JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2011, 17 (04) : 387 - 405
  • [9] Fuzzy Based Risk Register for Construction Project Risk Assessment
    Kuchta, Dorota
    Ptaszynska, Ewa
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2016 (ICNAAM-2016), 2017, 1863
  • [10] Fuzzy-Based Clustering Genetic Group Model of Project Practice Teaching
    Wan, Benting
    [J]. ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 1484 - 1487