Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants

被引:5
|
作者
Trach, Roman [1 ,2 ]
Khomenko, Oleksandr [3 ]
Trach, Yuliia [1 ,2 ]
Kulikov, Oleksii [4 ]
Druzhynin, Maksym [3 ]
Kishchak, Nataliia [3 ]
Ryzhakova, Galyna [3 ]
Petrenko, Hanna [3 ]
Prykhodko, Dmytro [3 ]
Obodianska, Olha [5 ]
机构
[1] Warsaw Univ Life Sci, Inst Civil Engn, PL-02776 Warsaw, Poland
[2] Natl Univ Water & Environm Engn, Inst Civil Engn & Architecture, UA-33028 Rivne, Ukraine
[3] Kyiv Natl Univ Construct & Architecture, Dept Management Construct, UA-03037 Kiev, Ukraine
[4] State Univ Trade & Econ, Dept Int Civil & Commercial Law, UA-02156 Kiev, Ukraine
[5] Kyiv Natl Univ Construct & Architecture, Dept Construct & Informat Technol, UA-03037 Kiev, Ukraine
关键词
centrality measures; communication; construction projects; social network analysis; fuzzy logic; SELF-ORGANIZING NETWORKS; TEAM; CENTRALITY; IMPACT; PERFORMANCE; SYSTEMS;
D O I
10.3390/su15075653
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The purpose of this research is to study the communication network among the participants in a construction project. The proposed approach contains the solving of the following tasks: identification of the key factors that affect the communication quality; calculation of the "communication quality" indicator between each pair of participants using fuzzy logic; and evaluation of the key measures of centrality using the tools of a Social Network Analysis. Solving the set tasks can help break the problem of the low level of efficiency of construction project deliveries. This study was conducted when the design stage was already complete and the construction project had 17 participants. We used the following factors influencing communication quality: timeliness, understanding, bidirectionality, use of IT tools in communication acts and adequacy. The use of fuzzy logic tools can minimise the subjectivity of the qualitative data obtained from the questionnaires. The analysis of five centrality measures showed that "Project manager", "Chief engineer", "Construction site manager", "Construction works manager" and "Architect" had the greatest values in comparison with other network participants. On the one hand, this organisational structure of communication can be considered correct because the main information flows through the project managers, who make the decisions. On the other hand, this indicates a significant dependence of the construction project on these participants and, in the event of certain risk events, may lead to a decrease in the efficiency of its implementation. The methods presented in this article can be used in project management to analyse a real communication network.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] An application of fuzzy logic to the assessment of aquifers' pollution potential
    Cameron, E
    Peloso, GF
    ENVIRONMENTAL GEOLOGY, 2001, 40 (11-12): : 1305 - 1315
  • [42] Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm
    Nguyen, Dang-Trinh
    Le-Hoai, Long
    Tarigan, Putri Basenda
    Tran, Duc-Hoc
    ALEXANDRIA ENGINEERING JOURNAL, 2022, 61 (02) : 1499 - 1518
  • [43] Evaluation on Organization Communication Validity of the Construction Project Based on Fuzzy AHP
    Wang Yujie
    Liu Guoliang
    HUMAN RESOURCES MANAGEMENT IN THE KNOWLEDGE ECONOMY ERA, VOLS I AND II, 2009, : 486 - 494
  • [44] Construction Safety Monitoring Based on The Project's Characteristic with Fuzzy Logic Approach
    Winanda, Lila Ayu Ratna
    Adi, Trijoko Wahyu
    Anwar, Nadjadji
    Wahyuni, Febriana Santi
    3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903
  • [45] Fuzzy Based Risk Register for Construction Project Risk Assessment
    Kuchta, Dorota
    Ptaszynska, Ewa
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2016 (ICNAAM-2016), 2017, 1863
  • [46] Construction Project Risk Assessment Using Combined Fuzzy and FMEA
    Mohammadi, Amir
    Tavakolan, Mehdi
    PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 232 - 237
  • [47] USING THE FUZZY LOGIC DESCRIPTION FOR THE EX ANTE RISK ASSESSMENT IN THE PROJECT
    Kozien, Ewa
    Kozien, Marek S.
    ECONOMIC AND SOCIAL DEVELOPMENT (ESD 2018): 35TH INTERNATIONAL SCIENTIFIC CONFERENCE, 2018, : 224 - 231
  • [48] An Extended Bidirectional Projection Method for Picture Fuzzy MAGDM and Its Application to Safety Assessment of Construction Project
    Wei, Guiwu
    Zhang, Siqi
    Lu, Jianping
    Wu, Jiang
    Wei, Cun
    IEEE ACCESS, 2019, 7 : 166138 - 166147
  • [49] A fuzzy logic approach for determining expected values: A project management application
    Shipley, MF
    deKorvin, A
    Omer, K
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (04) : 562 - 569
  • [50] Application of fuzzy logic in environmental risk assessment: Some thoughts on fuzzy sets
    Ghomshei, MM
    Meech, JA
    CYBERNETICS AND SYSTEMS, 2000, 31 (03) : 317 - 332