Uncertainty of site period on the variability of the site period-based ground motion prediction equations

被引:0
|
作者
Hou, Ruibin [1 ]
Wang, Jinmei [1 ]
机构
[1] Xihua Univ, Sch Architecture & Civil Engn, Chengdu 610039, Peoples R China
基金
中国国家自然科学基金;
关键词
Ground -motion prediction equation; Variability; Site period; Engineering bedrock; Horizontal -to -vertical spectral ratio; EASTERN NORTH-AMERICA; SUBDUCTION INTERFACE EARTHQUAKES; NONINVASIVE METHODS; FUNDAMENTAL PERIOD; EFFECTS MODEL; SURFACE-WAVE; JAPAN; VS30; FREQUENCY; AMPLIFICATION;
D O I
10.1016/j.soildyn.2023.108345
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Site period has been widely acknowledged to be a reasonable site parameter for ground-motion modeling and site effect modeling. Its value could be analytically calculated using the shear-wave velocity (VS) profile by assuming that soil layers overlie a rigid bedrock, or empirically estimated from the horizontal-to-vertical spectral ratio (HVSR). In this study, we tested the uncertainty of site period on the variability of the site period-based groundmotion prediction equations (GMPEs). The ground-motion records and site data in Japan were used. We first used different VS values as engineering bedrock to derive a set of analytical site periods, and tested the uncertainty because of the bedrock VS selection on the GMPE variability. The results show that adding information about the stiff-soil or soft-rock layer beneath the surface soft-soil layers would significantly improve site effect prediction accuracy. An engineering bedrock with VS equal to about 800 m/s is recommended. We then tested the uncertainty of site period because of the choice between the analytical one and the empirical one on the GMPE variability. The empirical site period is better than the analytical site period at spectral periods from 0.06s to 0.4s. At spectral periods longer than 0.4s, the empirical site period produces larger variability than the analytical one using VS >= 800 m/s bedrock and has a better performance than that using VS < 600 m/s bedrock. The larger variability is partly contributed by the uncertainty in identifying site period value from the HVSR curve. Using the site period from the first peak of the HVSR curve generally produces a smaller variability than that from the highest peak. For sites with more than one comparable peak in the HVSR curve, the site period from the first peak is recommended. For the regions out of Japan, cautions may be paid for these recommendations because of the potential region dependence of site response.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Group and Period-Based Representations for Improved Machine Learning Prediction of Heterogeneous Alloy Catalysts
    Li, Xinyu
    Chiong, Raymond
    Page, Alister J.
    JOURNAL OF PHYSICAL CHEMISTRY LETTERS, 2021, 12 (21): : 5156 - 5162
  • [32] Ground motion prediction equations for Algeria and surrounding region using site classification based H/V spectral ratio
    Nasser Laouami
    Abdennasser Slimani
    Said Larbes
    Bulletin of Earthquake Engineering, 2018, 16 : 2653 - 2684
  • [33] Ground motion prediction equations for Algeria and surrounding region using site classification based H/V spectral ratio
    Laouami, Nasser
    Slimani, Abdennasser
    Larbes, Said
    BULLETIN OF EARTHQUAKE ENGINEERING, 2018, 16 (07) : 2653 - 2684
  • [34] Long-period and long-duration ground motion prediction equations for earthquakes along the sagami trough based on strong motion records
    Satoh T.
    Nakagawa H.
    Koyama S.
    Sato T.
    Tohdo M.
    Journal of Structural and Construction Engineering, 2019, 84 (758): : 501 - 511
  • [35] Moment Magnitude Estimation of Large Earthquakes Based on Long-Period Ground Motion Prediction Equations and Preassumed Fault Models
    Ibrahim, Rami
    Si, Hongjun
    Koketsu, Kazuki
    Miyake, Hiroe
    JOURNAL OF EARTHQUAKE AND TSUNAMI, 2016, 10 (02)
  • [36] Analysis of the effect of ground water level change on site predominant period
    Zhao, Guangwei
    Wang, He
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 499 - +
  • [37] Quantification of source-to-site distance uncertainty in ground motion models
    Yaghmaei-Sabegh, Saman
    Ebrahimi-Aghabagher, Mehdi
    NATURAL HAZARDS, 2019, 99 (01) : 287 - 306
  • [38] Quantification of source-to-site distance uncertainty in ground motion models
    Saman Yaghmaei-Sabegh
    Mehdi Ebrahimi-Aghabagher
    Natural Hazards, 2019, 99 : 287 - 306
  • [39] A Contact Period Seneca Site
    Skinner, Alanson
    AMERICAN ANTHROPOLOGIST, 1920, 22 (01) : 78 - 79
  • [40] Effects of the source parameters on long period near-fault ground motion in the case of complex site condition
    Liu Qi-Fang
    Jin Xing
    Ding Hai-Ping
    CHINESE JOURNAL OF GEOPHYSICS-CHINESE EDITION, 2008, 51 (01): : 186 - 196