A Fuzzy Overlapping Project Resource Optimization Model in the Project Construction Industry with a Fractal Approach

被引:1
|
作者
Zohrehvandi, Shakib [1 ]
机构
[1] Kharazmi Univ, Ctr European Studies, New Technol Dept, Tehran, Iran
来源
MOBILE NETWORKS & APPLICATIONS | 2024年 / 29卷 / 02期
关键词
Resource optimization; Pentagonal fuzzy method; Activity overlapping method; Project construction industry; Project resource planning; Fuzzy overlapping project resource optimization (FOPRO); MANAGEMENT;
D O I
10.1007/s11036-023-02254-z
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
When the number of projects in a company increases, it becomes very important to choose the right strategy to supply resources and raw materials in profit and loss and finish the work according to the schedule. This study presents a new mathematical model using the fractal method to optimize the resource planning system in project-oriented construction and industrial companies, and the results are analyzed. In the model proposed in this research, a fuzzy method and an overlapping method are used. Using the method of Pentagonal fuzzy numbers in determining the appropriate number of resources for project activities, as well as using a method of overlapping activities to determine the appropriate time of overlapping activities will lead to optimal use of project resources. This article aims to introduce a fuzzy overlapping project resource optimization (FOPRO) model in project-oriented construction and industrial companies by providing a fractal framework to minimize resource costs and the smooth flow of materials between projects to meet the existing demand. Assuming three levels of headquarters, regions, and projects, each of them in the collection is a self-similar structure defined as a fractal. The study was carried out in one of the contracting companies in the industrial and construction fields, which operates as a project-oriented project in different regions of the country. To evaluate the proposed model, the obtained results were compared with the results of previous models. The results showed that the model presented in this research was able to create optimization in terms of sending machines, material and manpower between different centers.
引用
收藏
页码:545 / 556
页数:12
相关论文
共 50 条
  • [21] OPTIMIZATION OF PROJECT RESOURCE ALLOCATION
    SHAMIR, U
    ISRAEL JOURNAL OF TECHNOLOGY, 1971, 9 (06): : 625 - &
  • [22] A model to optimize project resource allocation by construction of a balanced histogram
    Konstantinidis, PD
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 104 (03) : 559 - 571
  • [23] Ant colony optimization algorithm for resource leveling problem of construction project
    Xiong, Ying
    Kuang, Ya Ping
    PROCEEDINGS OF CRIOCM 2006 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2006, : 384 - 391
  • [24] Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management
    Trautmann, N.
    Baumann, P.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 628 - 632
  • [25] A Fuzzy-based Risk Model for Construction Project Management
    Chaher, Zid
    Benseghir, Hocine
    Ibrahim, Abdullah
    Kabir, Muhammad Nomani
    2018 IEEE CONFERENCE ON SYSTEMS, PROCESS AND CONTROL (ICSPC), 2018, : 129 - 134
  • [26] Fuzzy tradeoff optimization of time-cost-quality in construction project
    Management School, Xi'an Jiaotong University, Xi'an 710049, China
    Xitong Gongcheng Lilum yu Shijian, 2006, 7 (112-117):
  • [27] Resource-constrained project scheduling approach under fuzzy conditions
    Knyazeva, Margarita
    Bozhenyuk, Alexander
    Rozenberg, Igor
    ICTE IN REGIONAL DEVELOPMENT 2015, 2015, 77 : 56 - 64
  • [28] Fractal approach for manufacturing project management
    Karaulova, T.
    Poljantshikov, I.
    Shevtshenko, E.
    Kramarenko, S.
    MECHANIKA, 2014, (03): : 352 - 359
  • [29] Study on multi-objective optimization approach of construction project
    Zhao, Rui
    Liu, Xiao-Jun
    Shen, Jin-Shan
    Xi'an Jianzhu Keji Daxue Xuebao/Journal of Xi'an University of Architecture and Technology, 2008, 40 (06): : 858 - 862
  • [30] A proposed model for construction project management communication in the South African construction industry
    Zulch, Benita
    ACTA STRUCTILIA, 2016, 23 (01) : 1 - 35