A Fuzzy Overlapping Project Resource Optimization Model in the Project Construction Industry with a Fractal Approach

被引:1
|
作者
Zohrehvandi, Shakib [1 ]
机构
[1] Kharazmi Univ, Ctr European Studies, New Technol Dept, Tehran, Iran
来源
MOBILE NETWORKS & APPLICATIONS | 2024年 / 29卷 / 02期
关键词
Resource optimization; Pentagonal fuzzy method; Activity overlapping method; Project construction industry; Project resource planning; Fuzzy overlapping project resource optimization (FOPRO); MANAGEMENT;
D O I
10.1007/s11036-023-02254-z
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
When the number of projects in a company increases, it becomes very important to choose the right strategy to supply resources and raw materials in profit and loss and finish the work according to the schedule. This study presents a new mathematical model using the fractal method to optimize the resource planning system in project-oriented construction and industrial companies, and the results are analyzed. In the model proposed in this research, a fuzzy method and an overlapping method are used. Using the method of Pentagonal fuzzy numbers in determining the appropriate number of resources for project activities, as well as using a method of overlapping activities to determine the appropriate time of overlapping activities will lead to optimal use of project resources. This article aims to introduce a fuzzy overlapping project resource optimization (FOPRO) model in project-oriented construction and industrial companies by providing a fractal framework to minimize resource costs and the smooth flow of materials between projects to meet the existing demand. Assuming three levels of headquarters, regions, and projects, each of them in the collection is a self-similar structure defined as a fractal. The study was carried out in one of the contracting companies in the industrial and construction fields, which operates as a project-oriented project in different regions of the country. To evaluate the proposed model, the obtained results were compared with the results of previous models. The results showed that the model presented in this research was able to create optimization in terms of sending machines, material and manpower between different centers.
引用
收藏
页码:545 / 556
页数:12
相关论文
共 50 条
  • [41] A Fuzzy Approach for the Project Management
    Li Feng
    Wei Junyin
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5180 - 5183
  • [42] Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
    Rahim, Syukran Abdul
    Nawi, Mohd Nasrun Mohd
    Nifa, Faizatul Akmar Abdul
    ADVANCED SCIENCE LETTERS, 2016, 22 (5-6) : 1331 - 1335
  • [43] Optimization design of effective management model of large construction project
    Liu Xiao-li
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON AUTOMATION, MECHANICAL CONTROL AND COMPUTATIONAL ENGINEERING, 2015, 124 : 1799 - 1803
  • [44] Genetic Algorithms for Optimization of Resource Allocation in Large Scale Construction Project Management
    Huang, Jian-Wen
    Wang, Xing-xia
    Chen, Rui
    JOURNAL OF COMPUTERS, 2010, 5 (12) : 1916 - 1924
  • [45] Mathematical Model for Optimization of Construction Contracting in Housing Development Project
    Ngowtanasuwan, Grit
    ASIA PACIFIC INTERNATIONAL CONFERENCE ON ENVIRONMENT-BEHAVIOUR STUDIES (AICE-BS 2013) LONDON, 2013, 105 : 94 - 105
  • [46] Business center construction project as the model of resource-saving building
    Luchkina, V.V.
    Journal of Physics: Conference Series, 2020, 1614 (01)
  • [47] Business center construction project as the model of resource-saving building
    Luchkina, V. V.
    INTERNATIONAL SCIENTIFIC CONFERENCE ENERGY MANAGEMENT OF MUNICIPAL FACILITIES AND SUSTAINABLE ENERGY TECHNOLOGIES, 2020, 1614
  • [48] Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry
    Vahid Mohagheghi
    S. Meysam Mousavi
    Behnam Vahdani
    Neural Computing and Applications, 2017, 28 : 3393 - 3411
  • [49] Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry
    Mohagheghi, Vahid
    Mousavi, S. Meysam
    Vahdani, Behnam
    NEURAL COMPUTING & APPLICATIONS, 2017, 28 (11): : 3393 - 3411
  • [50] OPTIMIZATION OF RESOURCE ALLOCATION IN PROJECT PLANNING
    PETROVIC, R
    OPERATIONS RESEARCH, 1968, 16 (03) : 559 - &