A case study on design and construction of mined tunnel in challenging ground conditions in Singapore

被引:0
|
作者
Jinrong, Y. [1 ]
Claudia, M. [1 ]
Sharique, K. [2 ]
Venkatesh, G. [3 ]
机构
[1] COWI Singapore Pte Ltd, Singapore, Singapore
[2] COWI India Ltd, Gurugram, India
[3] Leighton Contractors Asia Ltd, Singapore Branch, Singapore, Singapore
关键词
D O I
10.1201/9781003348030-238
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a case study on design and construction of mined tunnel for DTSS2 in Singapore. The geological condition comprises excavation in soft soil, hard rock as well as unexpected fault zone with high water permeability. The analysis methods for mined tunnel in rock used included the Q-system, analytical closed-form calculations, kinematic analysis using the Unwedge software, while the analysis method for mined tunnel in soil was carried out using finite element method with ground stress relaxation assessment. Mechanical excavation with hydraulic breakers and excavators were adopted for construction of the mined tunnel. Probe drilling and grouting were carried out to form a water-tight zone surrounding the tunnel profile. Convergence points were installed and monitored to ensure the movement of the mined tunnel is within design limit. The excavation of the mined tunnel has completed in March 2022, the maximum convergence of mined tunnel recorded was well within the design work suspension level.
引用
收藏
页码:1979 / 1987
页数:9
相关论文
共 50 条
  • [41] Safety management in tunnel construction: Case study of Wuhan metro construction in China
    Ding, Lieyun
    Zhang, Limao
    Wu, Xianguo
    Skibniewski, Miroslaw J.
    Yu Qunzhou
    SAFETY SCIENCE, 2014, 62 : 8 - 15
  • [42] Experimental study on the mechanism of rockburst in tunnel construction by drilling and blasting construction in high ground stress stratum
    Wang, Bin
    Xu, Huaqiao
    Zhang, Qinghe
    Shen, Zhijun
    Jin, Yi
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [43] Productivity Metrics and Its Implementations in Construction Projects: A Case Study of Singapore
    Shan, Ming
    Li, Yu-Shan
    Hwang, Bon-Gang
    Chua, Jia-En
    SUSTAINABILITY, 2021, 13 (21)
  • [44] Challenging Arbitral Awards in the Construction Industry: Case Study of Infrastructure Disputes
    Hansen, Seng
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (01)
  • [45] Influence of tunnel blasting construction on adjacent highway tunnel: A case study in Wuhan, China
    Liu, Zihan
    Jiang, Nan
    Sun, Jinshan
    Xia, Yuqing
    Lyu, Guopeng
    INTERNATIONAL JOURNAL OF PROTECTIVE STRUCTURES, 2020, 11 (03) : 283 - 303
  • [46] A Case Study of DSM Method Applied to Urban Tunnel Construction
    Lee, Hyung Jun
    Im, Jong-Chul
    Seo, Minsu
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (02): : 381 - 386
  • [47] Study on planning and design of a multi utility tunnel in Suzhou-Singapore Industrial Park
    Jian, Wang
    ADVANCES IN UNDERGROUND SPACE DEVELOPMENT, 2013, : 573 - 577
  • [48] Case Study of Rehabilitation of a Damaged Underwater Tunnel in the Construction Phase
    Wang, Zhan
    Wang, Li-zhong
    Wang, Jin-chang
    Li, Ling-ling
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (01)
  • [49] Semmering Base Tunnel – Design and construction of the shaft head caverns under difficult conditions
    Wieland G.
    Prall K.
    Lenz G.
    Schachinger T.
    Gobiet G.
    2018, Ernst und Sohn (11): : 462 - 470
  • [50] CASE HISTORIES ON DESIGN AND CONSTRUCTION OF JET GROUTED GROUND FOR TRENCHLESS PROJECTS
    Kwong, James
    Sandefur, Kealohi
    Hashiro, Reyn
    GROUND IMPROVEMENT TECHNOLOGIES AND CASE HISTORIES, 2010, : 605 - 614