Influence of tunnel blasting construction on adjacent highway tunnel: A case study in Wuhan, China

被引:19
|
作者
Liu, Zihan [1 ,2 ]
Jiang, Nan [1 ]
Sun, Jinshan [1 ]
Xia, Yuqing [1 ]
Lyu, Guopeng [1 ]
机构
[1] China Univ Geosci, Fac Engn, Wuhan 430074, Hubei, Peoples R China
[2] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Blasting vibration; adjacent existing tunnel; finite element method; field monitoring; power spectrum analysis; modal analysis; INDUCED VIBRATION;
D O I
10.1177/2041419619888936
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the blasting construction of new tunnels adjacent to existing tunnels, it is important to properly evaluate and control the influence of blasting vibration. In this study, the peak particle velocity of the lining structure of the Huanglongshan highway tunnel (i.e. the existing tunnel) in Wuhan, China, which was adjacent to a tunnel under construction by blasting, was monitored and analyzed. The numerical model of the existing tunnel was established by the dynamic finite element software LS-DYNA, and the reliability of the model and parameter selections were verified based on the field monitoring data. The relationship between peak particle velocity and effective tensile stress of the tunnel lining structure was proposed based on the combination of measured peak particle velocity, dynamic stress distribution characteristics, and numerical simulations under different blasting conditions. Based on the maximum tensile stress criterion and considering the dynamic tensile strength increase factor of lining material, the safety threshold of peak particle velocity for existing tunnel lining structure and the maximum charge weight for new tunnel blasting were suggested.
引用
收藏
页码:283 / 303
页数:21
相关论文
共 50 条
  • [1] Safety management in tunnel construction: Case study of Wuhan metro construction in China
    Ding, Lieyun
    Zhang, Limao
    Wu, Xianguo
    Skibniewski, Miroslaw J.
    Yu Qunzhou
    [J]. SAFETY SCIENCE, 2014, 62 : 8 - 15
  • [2] Influence of blasting on excavation of a new tunnel adjacent to existing tunnel
    Institute of Geotechnical Engineering, Xi'an University of Technology, Xi'an 710048, China
    不详
    [J]. Yanshilixue Yu Gongcheng Xuebao, 2009, 1 (30-38):
  • [3] Vibration response of an existing tunnel to adjacent blasting construction
    Zhou Y.
    Wang S.L.
    Wang J.
    [J]. Chemical Engineering Transactions, 2016, 55 : 31 - 36
  • [4] Vibration Performance of Steel Fiber Concrete Tunnel Lining by Adjacent Tunnel Blasting Construction
    Wu, Li-Ming
    Wang, Zi-Jian
    Chang, Yong-Zai
    Gao, Feng
    Zhang, Bin
    Wu, Yi
    Fan, Han-Xiu
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (07):
  • [5] Influence of blasting vibration on adjacent buildings of station tunnel
    Zhu, Ze-Bing
    Zhang, Yong-Xing
    Liu, Xin-Rong
    Zhao, Bao-Yun
    [J]. Chongqing Daxue Xuebao/Journal of Chongqing University, 2010, 33 (02): : 110 - 116
  • [6] IMPACT OF BLASTING AT TUNNEL FACE ON AN EXISTING ADJACENT TUNNEL
    Dang, V. K.
    Dias, D.
    Do, N. A.
    Vo, T. H.
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2018, 15 (47): : 22 - 31
  • [7] Research on key technique of shield tunnel construction beneath adjacent existing highway tunnel
    Zhang Zhi-qiang
    He Chuan
    [J]. ROCK AND SOIL MECHANICS, 2005, 26 (11) : 1711 - 1716
  • [8] Evaluation of the Influence Caused by Tunnel Construction on Groundwater Environment: A Case Study of Tongluoshan Tunnel, China
    Liu, Jian
    Liu, Dan
    Song, Kai
    [J]. ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2015, 2015
  • [9] Study on effect of tunnelling blasting on existing adjacent tunnel
    Zhong, D. W.
    Wu, L.
    Yu, G.
    Wang, N. L.
    [J]. MATERIALS RESEARCH INNOVATIONS, 2011, 15 : S513 - S516
  • [10] Study on effect of tunnelling blasting on existing adjacent tunnel
    Zhong, D.W.
    Wu, L.
    Yu, G.
    Wang, N.L.
    [J]. Materials Research Innovations, 2011, 15 (SUPPL. 1)