A preprotection method for a pipe jacking channel over shield tunnels

被引:0
|
作者
Cui, Yunliang [1 ,2 ]
Yang, Xukun [1 ,2 ]
Wang, Xinquan [1 ,2 ]
Diao, Hongguo [1 ,2 ]
Li, Xiao [1 ,2 ]
Gao, Yuanyuan [1 ,2 ]
机构
[1] Hangzhou City Univ, Sch Engn, Hangzhou 310015, Peoples R China
[2] Key Lab Safe Construct & Intelligent Maintenance, Hangzhou 310015, Peoples R China
关键词
shield; pipe jacking; numerical simulation; TWIN TUNNELS; DEFORMATION; PROTECTION; BENEATH;
D O I
10.24425/bpasts.2023.148443
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the improvement of the planning level of underground space, the location of the planned under-crossing tunnel can be known in advance when constructing the upper-span tunnel. Therefore, preprotection measures can be taken in advance during the construction of the upper span tunnel. A new preprotection method of a pipe jacking channel was proposed to reduce the adverse effects of under-corssing shield tunnels. Numerical simulations of different preprotection schemes were carried out using finite element method to analyze its deformation control effect. The simulation results show that the deformation control effect of the gantry reinforcement scheme is the most significant. It is shown that the displacement of the pipe jacking channel is more significantly suppressed with preprotection measures than without preventive protection measures. The vertical displacement curve of the pipe jacking channel exhibits a "W" shape after the construction of the double-lane shield underpass. By comparing the three different working conditions, it is found that the maximum vertical displacement and surface settlement of the pipe jacking channel were greatly reduced the gantry reinforcement pre-protection. Compared with Case 3, the effect of the pre-protection measures adopted in Case 2 was less obvious, which indicated that the form of the pre-protection had an important influence on controlling the deformation of the pipe jacking channel.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] The influence of pipe-jacking tunneling on deformation of existing tunnels in soft soils and the effectiveness of protection measures
    He, Haijie
    Wang, Shifang
    Shen, Wenming
    Zhang, Wenjie
    TRANSPORTATION GEOTECHNICS, 2023, 42
  • [32] Over-cutting area control by using RADAR application in large diameter slurry pipe jacking method
    Khazaei, S
    Shimada, H
    Matsui, K
    Kawai, T
    Yotsumoto, J
    Contribution of Rock Mechanics to the New Century, Vols 1 and 2, 2004, : 633 - 638
  • [33] Research on Axial Stress and Strain Characteristics of Reinforced-Concrete Curved Pipe Jacking in Power Tunnels
    He, Yongjun
    Cheng, Jian
    Shi, Zengli
    Zhang, Bin
    Chen, Li
    Li, Xi
    Wang, Xiaoli
    Zhang, Peng
    BUILDINGS, 2024, 14 (09)
  • [34] Behavior of lubricant injection into over-cutting area for slurry pipe jacking
    Department of Earth Resources Engineering, Kyushu University, Fukuoka, Japan
    不详
    不详
    1600, 350-357 (2006):
  • [35] The impact of pipe jacking method entrance and exit construction on the surrounding environment
    Qi Zongrun
    Liu Junyan
    Gong Ke
    2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
  • [36] CONSTRUCTION OF ELLIPTIC SECTIONAL UNDERPASS BY NEW PIPE JACKING METHOD.
    Takeshita, Sadao
    Quarterly Report of RTRI (Railway Technical Research Institute) (Japan), 1983, 24 (01): : 9 - 14
  • [37] Control of settlement due to tunnel construction by slurry pipe jacking method
    Shimada, H
    Khazaei, S
    Matsui, K
    Kawai, T
    Yotsumoto, J
    Mining Science and Technology, 2004, : 377 - 382
  • [38] A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction
    Niu, Zelin
    Cheng, Yun
    Zhang, Yuwei
    Song, Zhanping
    Yang, Guiyang
    Li, Hui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [39] Sub-sea microtunnel by pipe jacking method - Construction challenges
    Ahmed, Syed Shakil
    Alfaour, Sam
    Al Ghanem, Mohammad
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1597 - 1601
  • [40] Developing a risk assessment method for complex pipe jacking construction projects
    Cheng, Min
    Lu, Yujie
    AUTOMATION IN CONSTRUCTION, 2015, 58 : 48 - 59