A preprotection method for a pipe jacking channel over shield tunnels

被引:0
|
作者
Cui, Yunliang [1 ,2 ]
Yang, Xukun [1 ,2 ]
Wang, Xinquan [1 ,2 ]
Diao, Hongguo [1 ,2 ]
Li, Xiao [1 ,2 ]
Gao, Yuanyuan [1 ,2 ]
机构
[1] Hangzhou City Univ, Sch Engn, Hangzhou 310015, Peoples R China
[2] Key Lab Safe Construct & Intelligent Maintenance, Hangzhou 310015, Peoples R China
关键词
shield; pipe jacking; numerical simulation; TWIN TUNNELS; DEFORMATION; PROTECTION; BENEATH;
D O I
10.24425/bpasts.2023.148443
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the improvement of the planning level of underground space, the location of the planned under-crossing tunnel can be known in advance when constructing the upper-span tunnel. Therefore, preprotection measures can be taken in advance during the construction of the upper span tunnel. A new preprotection method of a pipe jacking channel was proposed to reduce the adverse effects of under-corssing shield tunnels. Numerical simulations of different preprotection schemes were carried out using finite element method to analyze its deformation control effect. The simulation results show that the deformation control effect of the gantry reinforcement scheme is the most significant. It is shown that the displacement of the pipe jacking channel is more significantly suppressed with preprotection measures than without preventive protection measures. The vertical displacement curve of the pipe jacking channel exhibits a "W" shape after the construction of the double-lane shield underpass. By comparing the three different working conditions, it is found that the maximum vertical displacement and surface settlement of the pipe jacking channel were greatly reduced the gantry reinforcement pre-protection. Compared with Case 3, the effect of the pre-protection measures adopted in Case 2 was less obvious, which indicated that the form of the pre-protection had an important influence on controlling the deformation of the pipe jacking channel.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Development of long span pipe jacking method for laying underground pipe
    Akahide, Kohzo
    Fujimoto, Tomoya
    Nagano, Eiji
    Sasaki, Horoshi
    Takeuchi, Takashi
    Doi, Hatsuji
    Kawasaki Steel Technical Report, 1988, (19): : 105 - 112
  • [22] Estimation of thrust in the construction of small-diameter tunnels using pipe-jacking
    Shimada, H
    Kubota, S
    Matsui, K
    MINING SCIENCE AND TECHNOLOGY 99, 1999, : 419 - 422
  • [23] SMALL DIAMETER PIPE JACKING METHOD FOR COMMUNICATION SERVICES
    YAMAMOTO, H
    JAPAN TELECOMMUNICATIONS REVIEW, 1985, 27 (04): : 237 - 244
  • [24] Study on Calculation Method of Jacking Force for Circular Curve Pipe Jacking Considering Pipe-Soil Contact State
    Pei, Chao
    Shi, Bingjian
    Peng, Yonghui
    Niu, Jiatong
    Liu, Ying
    INDIAN GEOTECHNICAL JOURNAL, 2024, 54 (04) : 1392 - 1405
  • [25] Evolution laws of internal forces in rectangular pipe jacking tunnels with large section and shallow soil
    Zhu W.-J.
    Zhen L.
    Xu W.-Y.
    Li X.-J.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 : 130 - 133
  • [26] Bending Performance of the Steel Longitudinal Joint for Quasi-Rectangular Pipe-Jacking Tunnels
    Wu, Dongpeng
    Zhao, Huiling
    Shen, Haochong
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2022, 13 (03)
  • [27] Structural response of existed metro tunnels to adjacent large-section pipe jacking construction
    Liu, Bo
    Zhang, Dingwen
    Fang, Lei
    PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE TRANSPORTATION GEOTECHNICS AND GEOECOLOGY (TGG-2017), 2017, 189 : 11 - 17
  • [28] Analysis on the Method Selection of Pipeline Detection of Trenchless Pipe Jacking
    Dong, Rongwei
    Zhuo, Qiliang
    Zhou, Lijun
    2016 3RD INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION AND BUSINESS INNOVATION (ICMIBI 2016), PT 2, 2016, 58 : 380 - 383
  • [29] A graphical method for predicting ground movements from pipe jacking
    Chapman, DN
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 1999, 137 (02) : 87 - 96
  • [30] CoJack - A new statics method of computing and controlling pipe jacking
    Beckmann, Dietmar
    Stein, Robert
    Fabri, Tobias
    Uhlenbroch, Adrian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2007, 22 (5-6) : 587 - 599