Structural response of existed metro tunnels to adjacent large-section pipe jacking construction

被引:12
|
作者
Liu, Bo [1 ]
Zhang, Dingwen [1 ]
Fang, Lei [1 ]
机构
[1] Southeast Univ, Sch Transportat, 2 Sipailou, Nanjing 210096, Jiangsu, Peoples R China
关键词
Structural response; Metro tunnel; Pipe jacking; Field Monitoring; SOIL; SLURRY;
D O I
10.1016/j.proeng.2017.05.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A rectangular pedestrian underpass of 94.5m long, 7m wide and 4.3m high was constructed across the existed metro tunnels using pipe jacking method. The minimum distance from underpass bottom to tunnel crown was 4.5m. In order to investigate the effects of pipe jacking on existed underlying tunnels, the instruments were installed in the tunnels and structural responses were extensively monitored. Based on the field observations, the vertical displacement, horizontal displacement and diameter convergence of the tunnel were analyzed. The results indicate that in the whole pipe jacking process, the tunnel vertical displacement mainly goes through three different stages, namely, initial settlement stage, quick heave stage and steady heave stage. The horizontal displacement of ballast bed is much smaller than that of tunnel crown and is almost negligible. The tunnel was horizontally compressed and vertically stretched after pipe jacking construction. Pipe jacking construction has a greater effect on the tunnel structures just below the underpass than that beyond the width scope of underpass, whether it is vertical displacement, horizontal displacement or diameter convergence of the tunnel. (C) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:11 / 17
页数:7
相关论文
共 50 条
  • [1] Structural Behaviors of Large-Section Mine Tunnels Undercrossing Existing Metro Lines
    Zhai, Lihua
    Cai, Gensen
    Liang, Yuehua
    Guan, Shaoxiang
    Wang, Shuying
    Liaquat, Luqman
    BUILDINGS, 2023, 13 (07)
  • [2] Model tests on large-section and shallow soil rectangular pipe jacking
    Pan, Yu-Qing
    Zhen, Liang
    Jiang, Hai-Li
    Li, Xiao-Jun
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 : 125 - 129
  • [3] Construction Risk Control of Large-Section, Small-Spacing Rectangular Pipe-Jacking Metro Stations: A Case Study of Haibang Metro Station in Guangzhou, China
    Wu, Senyang
    Chen, Xiang
    Chen, Peng
    Zeng, Yuhan
    Tunnel Construction, 2025, 45 (02) : 382 - 391
  • [4] Construction of a large-section long pedestrian underpass using pipe jacking in muddy silty clay: A case study
    Zhang, Dingwen
    Liu, Bo
    Qin, Yujun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 60 : 151 - 164
  • [5] Numerical Analysis on Large-Section Pipe Jacking within Close Distance in Soft Soil
    Xie, Xiaoli
    Ye, Bin
    IFCEE 2021: EARTH RETENTION, GROUND IMPROVEMENT, AND SEEPAGE CONTROL, 2021, 324 : 156 - 165
  • [6] Temporal variation laws of longitudinal stress of pipe jacking with large-section steel structure
    Liu, Xian
    Jiao, Bo-Chang
    Pan, Wei-Qiang
    Huang, Ai-Jun
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 (10): : 1810 - 1816
  • [7] Deformation Response of Metro Tunnels to Adjacent Tram Track Construction
    Shan, Yao
    Zhou, Shunhua
    Gong, Quanmei
    Zhang, Xiaohui
    Xu, Sihui
    RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 774 - 780
  • [8] Numerical simulation and field monitoring on a large cross-section pipe-jacking underpass traversing existing metro tunnels
    Liu, Bo
    Zhang, Dingwen
    Liu, Songyu
    Qin, Yunjun
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2017, 36 (11): : 2850 - 2860
  • [9] Application and analysis of forepoling and large-section box culvert jacking for underpass highway construction
    Zhengzhou Supervise Bureau of Highway, Zhengzhou 450015, China
    不详
    Tumu Gongcheng Xuebao, 2008, 4 (106-111):
  • [10] Analytical solutions for surface deformation induced by jacking large-section pipe curtain box culvert
    Zhang, Kunyong
    Li, Danyang
    Zhang, Meng
    Shen, Xiaorui
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 47 (01): : 184 - 191