An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms

被引:3
|
作者
Ghoroqi, Mahyar [1 ]
Ghoddousi, Parviz [1 ]
Makui, Ahmad [2 ]
Javid, Ali Akbar Shirzadi [1 ]
Talebi, Saeed [3 ]
机构
[1] Iran Univ Sci & Technol, Sch Civil Engn, Tehran 1684613114, Iran
[2] Iran Univ Sci & Technol, Sch Ind Engn, Tehran 1684613114, Iran
[3] Birmingham City Univ, Coll Built Environm, Fac Comp Engn & Built Environm, Birmingham B4 7XG, England
关键词
multi-mode resource-constrained multi-project scheduling problems (MMRCMPSPs); multi-objective mathematical modeling; metaheuristic optimization algorithms; uncertainty; evidence theory; sustainability; GENETIC ALGORITHM; PERFORMANCE; DESIGN; RULES;
D O I
10.3390/buildings13082023
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, the multi-mode resource-constrained multi-project scheduling problems (MMRCMPSPs) considering supply management and sustainable approach in the construction industry under uncertain conditions have been investigated using evidence theory to mathematical modeling and solving by multi-objective optimization algorithms. In this regard, a multi-objective mathematical model has been proposed, in which the first objective function aims to maximize a weighted selection of projects based on economic, environmental, technical, social, organizational, and competitive factors; the second objective function is focused on maximizing profit, and the third objective function is aimed at minimizing the risk of supply management. Moreover, various components, such as interest rates, carbon penalties, and other implementation limitations and additional constraints, have also been considered in the modeling and mathematical relationships to improve the model's performance and make it more relevant to real-world conditions and related issues, leading to better practical applications. In the mathematical modeling adopted, the processing time of project activities has been considered uncertain, and the evidence theory has been utilized. This method can provide a flexible and rational approach based on evidence and knowledge in the face of uncertainty. In addition, to solve the proposed multi-objective mathematical model, metaheuristic optimization algorithms, such as the differential evolution (DE) algorithm based on the Pareto archive, have been used, and for evaluating the results, the non-dominated sorting genetic algorithm II (NSGA-II) has also been employed. Furthermore, the results have been compared based on multi-objective evaluation criteria, such as quality metric (QM), spacing metric (SM), and diversity metric (DM). It is worth noting that to investigate the performance and application of the proposed model, multiple evaluations have been conducted on sample problems with different dimensions, as well as a case study on residential apartment construction projects by a contracting company. In this respect, the answers obtained from solving the model using the multi-objective DE algorithm were better and superior to the NSGA-II algorithm and had a more favorable performance. Generally, the results indicate that using the integrated multi-objective mathematical model in the present research for managing and scheduling multi-mode resource-constrained multi-project problems, especially in the construction industry, can lead to an optimal state consistent with the desired objectives and can significantly improve the progress and completion of projects.
引用
下载
收藏
页数:34
相关论文
共 50 条
  • [1] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [2] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [3] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [4] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [5] The Multi-Mode Resource-Constrained Multi-Project Scheduling ProblemThe MISTA 2013 challenge
    Tony Wauters
    Joris Kinable
    Pieter Smet
    Wim Vancroonenburg
    Greet Vanden Berghe
    Jannes Verstichel
    Journal of Scheduling, 2016, 19 : 271 - 283
  • [6] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [7] A robust optimization approach for the multi-mode resource-constrained project scheduling problem
    Balouka, Noemie
    Cohen, Izack
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 457 - 470
  • [8] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [9] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [10] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    OPEN ENGINEERING, 2019, 9 (01): : 7 - 13