An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms

被引:3
|
作者
Ghoroqi, Mahyar [1 ]
Ghoddousi, Parviz [1 ]
Makui, Ahmad [2 ]
Javid, Ali Akbar Shirzadi [1 ]
Talebi, Saeed [3 ]
机构
[1] Iran Univ Sci & Technol, Sch Civil Engn, Tehran 1684613114, Iran
[2] Iran Univ Sci & Technol, Sch Ind Engn, Tehran 1684613114, Iran
[3] Birmingham City Univ, Coll Built Environm, Fac Comp Engn & Built Environm, Birmingham B4 7XG, England
关键词
multi-mode resource-constrained multi-project scheduling problems (MMRCMPSPs); multi-objective mathematical modeling; metaheuristic optimization algorithms; uncertainty; evidence theory; sustainability; GENETIC ALGORITHM; PERFORMANCE; DESIGN; RULES;
D O I
10.3390/buildings13082023
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, the multi-mode resource-constrained multi-project scheduling problems (MMRCMPSPs) considering supply management and sustainable approach in the construction industry under uncertain conditions have been investigated using evidence theory to mathematical modeling and solving by multi-objective optimization algorithms. In this regard, a multi-objective mathematical model has been proposed, in which the first objective function aims to maximize a weighted selection of projects based on economic, environmental, technical, social, organizational, and competitive factors; the second objective function is focused on maximizing profit, and the third objective function is aimed at minimizing the risk of supply management. Moreover, various components, such as interest rates, carbon penalties, and other implementation limitations and additional constraints, have also been considered in the modeling and mathematical relationships to improve the model's performance and make it more relevant to real-world conditions and related issues, leading to better practical applications. In the mathematical modeling adopted, the processing time of project activities has been considered uncertain, and the evidence theory has been utilized. This method can provide a flexible and rational approach based on evidence and knowledge in the face of uncertainty. In addition, to solve the proposed multi-objective mathematical model, metaheuristic optimization algorithms, such as the differential evolution (DE) algorithm based on the Pareto archive, have been used, and for evaluating the results, the non-dominated sorting genetic algorithm II (NSGA-II) has also been employed. Furthermore, the results have been compared based on multi-objective evaluation criteria, such as quality metric (QM), spacing metric (SM), and diversity metric (DM). It is worth noting that to investigate the performance and application of the proposed model, multiple evaluations have been conducted on sample problems with different dimensions, as well as a case study on residential apartment construction projects by a contracting company. In this respect, the answers obtained from solving the model using the multi-objective DE algorithm were better and superior to the NSGA-II algorithm and had a more favorable performance. Generally, the results indicate that using the integrated multi-objective mathematical model in the present research for managing and scheduling multi-mode resource-constrained multi-project problems, especially in the construction industry, can lead to an optimal state consistent with the desired objectives and can significantly improve the progress and completion of projects.
引用
下载
收藏
页数:34
相关论文
共 50 条
  • [31] Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem
    Asta, Shahriar
    Karapetyan, Daniel
    Kheiri, Ahmed
    Ozcan, Ender
    Parkes, Andrew J.
    INFORMATION SCIENCES, 2016, 373 : 476 - 498
  • [32] A matheuristic-oriented iterated greedy algorithm for multi-mode resource-constrained project scheduling problem under uncertainty
    Gao, Zheng
    Zhang, Liping
    Yu, Puliang
    Zhang, Zikai
    Li, Zixiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 193
  • [33] Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm*
    Yang, Hongbing
    Wang, Ziyang
    Gao, Yue
    Zhou, Wei
    APPLIED SOFT COMPUTING, 2024, 152
  • [34] Integrated scheduling of suppliers and multi-project activities for green construction supply chains under uncertainty
    RezaHoseini, Ali
    Noori, Siamak
    Ghannadpour, Seyed Farid
    AUTOMATION IN CONSTRUCTION, 2021, 122
  • [35] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Sabzehparvar, Majid
    Seyed-Hosseini, S. Mohammad
    JOURNAL OF SUPERCOMPUTING, 2008, 44 (03): : 257 - 273
  • [36] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Majid Sabzehparvar
    S. Mohammad Seyed-Hosseini
    The Journal of Supercomputing, 2008, 44 : 257 - 273
  • [37] A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (01) : 321 - 363
  • [38] Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction
    Yuan, Yisong
    Ye, Sudong
    Lin, Lin
    Gen, Mitsuo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [39] Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (01) : 138 - 167
  • [40] A Bi-Level Model with Rough Coefficients for Multi-Mode Resource-Constrained Scheduling Problems
    Zhang, Z.
    Wang, Y.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 711 - 714