A study on the key drivers of national construction project audit risk and evolvement mechanism

被引:0
|
作者
Yang, Mianzhi [1 ]
Hui, Qing [2 ]
Yang, Qingru [3 ]
Fan, Mengwei [4 ]
Li, Xin [5 ]
机构
[1] Univ Sci & Technol Beijing, Beijing, Peoples R China
[2] China Univ Petr, Beijing, Peoples R China
[3] Kent Business Sch, Canterbury, England
[4] Capital Univ Econ & Business, Beijing, Peoples R China
[5] China Univ Min & Technol, Sch Foreign Studies, Xuzhou, Peoples R China
关键词
National construction projects audit; Qualitative analysis; Audit risk; Micro-causes; PERFORMANCE;
D O I
10.1108/ECAM-02-2023-0176
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeChina has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public projects. This paper presents a systematic research study on the causes of audit risks in national public projects and discusses the process by which these causes contribute to the emergence of such risks. Furthermore, the paper investigates the core risk sources in various types of national construction project audit. This paper aims to provide theoretical support for auditors of national construction projects in risk avoidance when conducting audits.Design/methodology/approachIn this study, the authors carefully selected five national public audit projects from China and performed a comprehensive analysis of 85 relevant audit documentation. The textual analysis was conducted using Nvivo12 software, and the grounded theory approach was adopted for generalization purposes.FindingsBased on the research results, the findings suggest that there are five key causes contributing to the audit risk of national construction projects: professional competence, risk awareness, management capacity, level of attention and deliberate fraud. The most critical factor identified is management capability, with 59.93% of the data supporting this view. This conclusion was based on an analysis of state-owned enterprises, administrative organs and public institutions. Building upon this, a framework titled "the mechanism of audit risk factors with management capability as the core" was constructed.Originality/valueThis paper employs qualitative analysis methods to examine national construction projects in China, contributing new literature to the theoretical study of audit risk management. The article also provides practical recommendations for auditors on how to mitigate audit risks and improve the quality of audit services in national project governance.
引用
收藏
页码:427 / 453
页数:27
相关论文
共 50 条
  • [41] Study on the Mechanism of Safety Risk Propagation in Subway Construction Projects
    Han, Yuanwen
    Shen, Jiang
    Zhu, Xuwei
    An, Bang
    Liu, Fusheng
    Bao, Xueying
    SUSTAINABILITY, 2024, 16 (02)
  • [42] REVIEW OF PIPE WALL THINNING MECHANISM STUDY AND ITS NATIONAL PROJECT IN JAPAN
    Miyano, Hiroshi
    Sekimura, Naoto
    Takizawa, Masayuki
    Matsumoto, Masaaki
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, PVP 2011, VOL 6, A AND B, 2012, : 1411 - 1418
  • [43] Key audit matters disclosure: do they reveal construction firm's risk of financial distress? Evidence from Ethiopia
    Wassie, Fekadu Agmas
    Lakatos, Laszlo Peter
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (15) : 1689 - 1697
  • [44] Study on Key Environment Risk Factors of Complex Mountainous and Hazardous Railway Project
    Sun, Ruijiao
    Liu, Yisheng
    Gan, Xuyang
    2021, Science Press (43): : 163 - 170
  • [45] Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice
    Shen, Li-yin
    Tam, Vivian W. Y.
    Tam, Leona
    Ji, Ying-bo
    JOURNAL OF CLEANER PRODUCTION, 2010, 18 (03) : 254 - 259
  • [46] BIOMONITORING: A KEY TO SUCCESSFUL ENVIRONMENTAL COMPLIANCE FOR PIPELINE CONSTRUCTION CYPRESS PIPELINE PROJECT - A CASE STUDY
    Goldstein, Jason M.
    Goldstein, Rebecca F.
    IPC2008: PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE - 2008, VOL 1, 2009, : 229 - 232
  • [47] Fuzzy based risk assessment module for metropolitan construction project: An empirical study
    Samantra, Chitrasen
    Datta, Saurav
    Mahapatra, Siba Sankar
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 65 : 449 - 464
  • [48] Study on Social Risk Appraise of Construction Project in China -A Case From Guangzhou
    Chen, Lin
    Wu, Kai-ze
    Tan, Jian-hui
    Li, Ming-fei
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2916 - +
  • [49] Application of project risk management and performance indices in the construction sector: a case study
    Ciaramella, Andrea
    TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT, 2013, 6 : 100 - 108
  • [50] Study on the Risk Control of Project of Construction Agency System Based on the Interface Management
    Wang Qi
    Tang Yongzhong
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 383 - 386