A study on the key drivers of national construction project audit risk and evolvement mechanism

被引:0
|
作者
Yang, Mianzhi [1 ]
Hui, Qing [2 ]
Yang, Qingru [3 ]
Fan, Mengwei [4 ]
Li, Xin [5 ]
机构
[1] Univ Sci & Technol Beijing, Beijing, Peoples R China
[2] China Univ Petr, Beijing, Peoples R China
[3] Kent Business Sch, Canterbury, England
[4] Capital Univ Econ & Business, Beijing, Peoples R China
[5] China Univ Min & Technol, Sch Foreign Studies, Xuzhou, Peoples R China
关键词
National construction projects audit; Qualitative analysis; Audit risk; Micro-causes; PERFORMANCE;
D O I
10.1108/ECAM-02-2023-0176
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeChina has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public projects. This paper presents a systematic research study on the causes of audit risks in national public projects and discusses the process by which these causes contribute to the emergence of such risks. Furthermore, the paper investigates the core risk sources in various types of national construction project audit. This paper aims to provide theoretical support for auditors of national construction projects in risk avoidance when conducting audits.Design/methodology/approachIn this study, the authors carefully selected five national public audit projects from China and performed a comprehensive analysis of 85 relevant audit documentation. The textual analysis was conducted using Nvivo12 software, and the grounded theory approach was adopted for generalization purposes.FindingsBased on the research results, the findings suggest that there are five key causes contributing to the audit risk of national construction projects: professional competence, risk awareness, management capacity, level of attention and deliberate fraud. The most critical factor identified is management capability, with 59.93% of the data supporting this view. This conclusion was based on an analysis of state-owned enterprises, administrative organs and public institutions. Building upon this, a framework titled "the mechanism of audit risk factors with management capability as the core" was constructed.Originality/valueThis paper employs qualitative analysis methods to examine national construction projects in China, contributing new literature to the theoretical study of audit risk management. The article also provides practical recommendations for auditors on how to mitigate audit risks and improve the quality of audit services in national project governance.
引用
收藏
页码:427 / 453
页数:27
相关论文
共 50 条
  • [21] Research on Key Risk Factors and Risk Transmission Path of Procurement in International Engineering Procurement Construction Project
    Wang, Qing'e
    Wang, Jing
    BUILDINGS, 2022, 12 (05)
  • [22] The key drivers for leadership skills development practices in the UK construction industry: An empirical study
    School of Engineering and the Built Environment, University of Wolverhampton, Wulfruna Street, Wolverhampton, WV1 1LY, United Kingdom
    不详
    不详
    COBRA - Constr. Build. Res. Conf. R. Inst. Chart. Surv., 1600, (278-288):
  • [23] Using the myocardial infarction national audit project database to validate acute coronary syndrome risk scores by subgroup risk
    Gale, C.
    Manda, S.
    Weston, C.
    Birkhead, J.
    Batin, P.
    Hall, A.
    HEART, 2007, 93 : A35 - A36
  • [24] Evaluation of risk scores for risk stratification of acute coronary syndromes in the Myocardial Infarction National Audit Project (MINAP) database
    Gale, C. P.
    Manda, S. O. M.
    Weston, C. F.
    Birkhead, J. S.
    Batin, P. D.
    Hall, A. S.
    HEART, 2009, 95 (03) : 221 - 227
  • [25] Study on Risk Allocationand Management Performance Measurement of Construction Project
    YilinYin
    Li, Pengjuan
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 2346 - 2350
  • [26] Study on safety risk warning index for highway construction project
    Peng, Jianhua
    PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURAL AND HYDRAULIC ENGINEERING (ICCAHE 2016), 2016, 95 : 934 - 938
  • [27] Study of dependencies in a risk management process: case of a construction project
    Lmoussaoui, Hafida
    Jamouli, Hicham
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 112 - 117
  • [28] A Study on Public Construction Project Duration Risk Identification and Evaluation
    Lu, Fuzhou
    Zhou, Yan
    Shang, Jingyu
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1593 - 1596
  • [29] Study on risk management in total life cycle of construction project
    Liu Jun'e
    Jia Zengke
    Ll Man
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 348 - 352
  • [30] Study on quality risk management of construction project quality control
    Han Guobo
    Gao Quanchen
    Ma Jinghua
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 889 - 892