Incorporation price uncertainty into open-pit to underground mine transition

被引:3
|
作者
Dehghani, Hesam [1 ]
Sakinezhad, Reza [1 ]
Nabavi, Zohre [2 ]
Babanouri, Nima [1 ]
机构
[1] Hamedan Univ Technol, Fac Min Engn, Hamadan, Iran
[2] Tarbiat Modares Univ, Fac Engn, Dept Min Engn, Tehran, Iran
关键词
Transition depth; Price uncertainty; Monte Carlo simulation; Open-pit mining; Underground mining; OPTIMIZATION; DEPTH;
D O I
10.1007/s13563-023-00408-9
中图分类号
F [经济];
学科分类号
02 ;
摘要
The growing demand for primary mineral resources and the finite nature of mineral reserves necessitate their efficient utilization while minimizing losses. To extend mine life and increase economic reserves, transitioning from open-pit to underground mining has proven to be a viable strategy. Identifying this critical transition depth is pivotal, as it significantly impacts mining profitability. Therefore, in this paper we propose a method to determine the open-pit/underground transition depth based on an economic block model, accounting for the final pit limit and considering the inherent uncertainty in mineral prices. To achieve our research aim, a hypothetical grade model was constructed initially, and we used @Risk software to perform Monte Carlo simulation of copper prices based on historical data. By generating 200 different mineral price scenarios, we created 200 economic block models. Subsequently, nine mining sequences were designed, and seven distinct scenarios were established to ascertain the final open-pit limit and the depth of the transition point between mining methods, contingent on fluctuating mineral prices. Based on the outcomes derived from the seven scenarios, the depth at which the mining method transition from open-pit to underground is recommended to be 375 m from the surface, under the aforementioned uncertainties. This recommendation is based on the cumulative net present value of open-pit/underground mining, as illustrated in scenario number 7. Our findings provide valuable insights for mining companies seeking to optimize resource utilization and maximize profitability while navigating uncertain mineral price environments.
引用
收藏
页码:89 / 99
页数:11
相关论文
共 50 条
  • [41] CUTOFFS GRADE CALCULATIONS FOR AN OPEN-PIT MINE
    JOHN, HT
    CIM BULLETIN, 1985, 78 (879): : 73 - 75
  • [42] Optimized Transportation of the Open-pit Coal Mine
    Cai B.
    Hao J.
    Zhu H.
    Chen H.
    Journal of Engineering Science and Technology Review, 2022, 15 (04) : 90 - 95
  • [43] OPEN-PIT MINE DESIGN IN SEISMIC AREAS
    DEVALLEJO, LG
    ELDRED, PJL
    OTEO, CS
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1984, 93 (OCT): : A192 - A197
  • [44] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [45] OPEN-PIT MINE AT ASBESTOS-HILL
    ROUSSIN, R
    CIM BULLETIN, 1976, 69 (775): : 70 - 74
  • [46] CUTOFFS GRADE CALCULATION FOR THE OPEN-PIT MINE
    JOHN, T
    CIM BULLETIN, 1984, 77 (863): : 91 - 91
  • [47] SLOPE DESIGN OF AN OPEN-PIT COPPER MINE
    SINGH, VK
    BALIGA, BD
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1994, 31 (01) : 55 - 69
  • [48] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [49] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764
  • [50] Open-Pit Mine Optimization with Maximum Satisfiability
    Matthew Deutsch
    Mining, Metallurgy & Exploration, 2019, 36 : 757 - 764