Incorporation price uncertainty into open-pit to underground mine transition

被引:3
|
作者
Dehghani, Hesam [1 ]
Sakinezhad, Reza [1 ]
Nabavi, Zohre [2 ]
Babanouri, Nima [1 ]
机构
[1] Hamedan Univ Technol, Fac Min Engn, Hamadan, Iran
[2] Tarbiat Modares Univ, Fac Engn, Dept Min Engn, Tehran, Iran
关键词
Transition depth; Price uncertainty; Monte Carlo simulation; Open-pit mining; Underground mining; OPTIMIZATION; DEPTH;
D O I
10.1007/s13563-023-00408-9
中图分类号
F [经济];
学科分类号
02 ;
摘要
The growing demand for primary mineral resources and the finite nature of mineral reserves necessitate their efficient utilization while minimizing losses. To extend mine life and increase economic reserves, transitioning from open-pit to underground mining has proven to be a viable strategy. Identifying this critical transition depth is pivotal, as it significantly impacts mining profitability. Therefore, in this paper we propose a method to determine the open-pit/underground transition depth based on an economic block model, accounting for the final pit limit and considering the inherent uncertainty in mineral prices. To achieve our research aim, a hypothetical grade model was constructed initially, and we used @Risk software to perform Monte Carlo simulation of copper prices based on historical data. By generating 200 different mineral price scenarios, we created 200 economic block models. Subsequently, nine mining sequences were designed, and seven distinct scenarios were established to ascertain the final open-pit limit and the depth of the transition point between mining methods, contingent on fluctuating mineral prices. Based on the outcomes derived from the seven scenarios, the depth at which the mining method transition from open-pit to underground is recommended to be 375 m from the surface, under the aforementioned uncertainties. This recommendation is based on the cumulative net present value of open-pit/underground mining, as illustrated in scenario number 7. Our findings provide valuable insights for mining companies seeking to optimize resource utilization and maximize profitability while navigating uncertain mineral price environments.
引用
收藏
页码:89 / 99
页数:11
相关论文
共 50 条
  • [21] ECSTALL STORY - OPEN-PIT MINE
    COUPLAND, GC
    CIM BULLETIN, 1974, 67 (745): : 64 - 69
  • [22] Slope Failure of Shilu Metal Mine Transition from Open-Pit to Underground Mining under Excavation Disturbance
    Yuan, Kang
    Ma, Chi
    Guo, Guolong
    Wang, Peitao
    APPLIED SCIENCES-BASEL, 2024, 14 (03):
  • [23] Optimal mining model of transition from open-pit to underground mining
    Wang, Xin-Min
    Zhao, Jian-Wen
    Zhang, Qin-Li
    Wu, Peng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (04): : 1434 - 1439
  • [24] Efficient simulation for an open-pit mine
    Dendle, Nicholas
    Isokangas, Erik
    Corry, Paul
    SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117
  • [25] Solving Challenges at an Open-Pit Mine
    GPS World, 2021, 32 (04): : 24 - 25
  • [26] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [27] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    OPERATIONS RESEARCH, 1963, 11 : B123 - B123
  • [28] Globally optimising open-pit and underground mining operations under geological uncertainty
    Montiel, L.
    Dimitrakopoulos, R.
    Kawahata, K.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2016, 125 (01): : 2 - 14
  • [29] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [30] Study on the Ground Movement in an Open-Pit Mine in the Case of Combined Surface and Underground Mining
    Wang, Zhenwei
    Song, Gaofeng
    Ding, Kuo
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2020, 2020 (2020)