Open-Pit Mine Optimization with Maximum Satisfiability

被引:0
|
作者
Matthew Deutsch
机构
[1] Colorado School of Mines,
来源
关键词
Mine planning; Optimization; Maximum satisfiability; Ultimate pit; Mine scheduling; Mining width;
D O I
暂无
中图分类号
学科分类号
摘要
A common casualty of modern open-pit mine optimization is the assurance that the resulting design is actually achievable. Optimized mine plans that consider value and a bare minimum of precedence constraints do not, in general, translate into practical, operational mine designs that can be used in the field. Ultimate pits may come to a sharp point at the bottom. Schedules may require taking small parcels of material from many disparate areas of the pit in a single period, and grade control polygons may be ragged, narrow, and not minable with realistic equipment. In this paper, all of these problems are addressed by encoding these three fundamental open-pit mine optimization problems as maximum satisfiability problems. Maximum satisfiability provides a useful framework for problems that are non-linear and may guarantee the optimality that metaheuristics cannot.
引用
收藏
页码:757 / 764
页数:7
相关论文
共 50 条
  • [1] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    [J]. MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764
  • [2] OPTIMIZATION OF AN OPEN-PIT MINE TRANSPORT-SYSTEM
    TENIC, A
    KORDIC, Z
    [J]. STROJARSTVO, 1981, 23 (06): : 321 - 329
  • [3] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [4] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [5] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    [J]. Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [6] Study on blasting parameters optimization in Anjialing open-pit mine
    Huang Xiaoming
    Zhang Ruixin
    Sun Qiang
    [J]. PROGRESS IN MINING SCIENCE AND SAFETY TECHNOLOGY, PTS A AND B, 2007, : 793 - 798
  • [7] Study on Optimization of Coal Truck Flow in Open-Pit Mine
    Bao, Haiming
    Zhang, Ruixin
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [8] Dynamic optimization of open-pit cutoff grade by the maximum principle
    Xie, Yingliang
    Xie, Linhai
    [J]. PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 2435 - 2441
  • [9] ECSTALL STORY - OPEN-PIT MINE
    COUPLAND, GC
    [J]. CIM BULLETIN, 1974, 67 (745): : 64 - 69
  • [10] Efficient simulation for an open-pit mine
    Dendle, Nicholas
    Isokangas, Erik
    Corry, Paul
    [J]. SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117