Study on Optimization of Coal Truck Flow in Open-Pit Mine

被引:7
|
作者
Bao, Haiming [1 ]
Zhang, Ruixin [1 ,2 ]
机构
[1] China Univ Min & Technol, Coll Energy & Min, Beijing 100083, Peoples R China
[2] North China Inst Sci & Technol, Langfang 065201, Peoples R China
关键词
D O I
10.1155/2020/8848140
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A semicontinuous process system consisting of a single-bucket excavator, truck, crushing station, and belt conveyor is the main coal mining process system of a large-scale hard coal open-pit mine. Through analyzing the coal mining production process, the key issues of coal mining truck flow optimization are obtained. Statistical method of using triangular fuzzy numbers analyzes the key time parameters of coal mining truck flow. Taking one shift, the minimum expected value of number of trucks, as the objective function, the fuzzy expectation of the coal mining semicontinuous process system is established with the constraints of the truck flow continuity at the loading and unloading point, the production capacity of the electric shovel, the production capacity of the crushing station, coal quality, and coal mining production tasks. The truck flow planning model is solved using particle swarm intelligence algorithm. The simulation results show that the result of truck flow planning can effectively reduce truck number, truck dispatching number, transportation costs, and truck queuing. The fuzzy expected truck flow planning model established by the study is suitable for solving the problem of optimizing and matching the production capacity in the process which links electric shovel, truck, and crushing station. It can effectively improve the production efficiency of electric shovel mining, truck transportation, and crushing station.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    [J]. OPERATIONS RESEARCH, 1963, 11 : B123 - B123
  • [2] Production schedule optimization in open-pit coal mine
    Gu, Xiao-Wei
    Xu, Xiao-Chuan
    Wang, Qing
    Zheng, You-Yi
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (08): : 1184 - 1187
  • [3] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [4] Investigation on flow field characteristics in an open-pit coal mine
    Wanjun Tang
    Fengming Li
    Gaoxiang Xiang
    Mengwei Liu
    [J]. Environmental Science and Pollution Research, 2022, 29 : 27585 - 27594
  • [5] Investigation on flow field characteristics in an open-pit coal mine
    Tang, Wanjun
    Li, Fengming
    Xiang, Gaoxiang
    Liu, Mengwei
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (18) : 27585 - 27594
  • [6] ICT Technologies in Optimization of Machines Movement at Open-Pit Coal Mine
    Ivanovic, Milos
    Skataric, Dobrila
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2019, 26 (04): : 1152 - 1158
  • [7] Dewatering optimization using a groudwater flow model at the Whitewood open-pit coal mine, Alberta
    Sumer, S.M.
    Elton, J.J.
    Tapics, J.A.
    [J]. Canadian Geotechnical Conference, 1987, : 79 - 87
  • [8] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    [J]. EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [9] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    [J]. Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [10] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    [J]. FRONTIERS IN EARTH SCIENCE, 2023, 10