ICT Technologies in Optimization of Machines Movement at Open-Pit Coal Mine

被引:1
|
作者
Ivanovic, Milos [1 ]
Skataric, Dobrila [1 ]
机构
[1] Univ Belgrade, Fac Mech Engn, Kraljice Marije 16, Belgrade 11000, Serbia
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2019年 / 26卷 / 04期
关键词
auxiliary machinery; ICT; GPS/GPRS technologies; model for optimizing; optimum route; open-pit coal mine; shortest path; software solution;
D O I
10.17559/TV-20170111064922
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Auxiliary machinery is used at the open-pit coal mine (machines: bulldozers, trench excavators, pipe-laying machines, ...) for performance of auxiliary work (excavation, construction of route, ....) in order to provide an uninterrupted operation of the basic machinery for excavation of waste rock and coal. Machines are moving from one area of the open-pit to another. Movement of machines along the open-pit is limited space-wise by conveyor belts serving for conveyance of waste rocks and coal, including other natural obstructions (steep slopes, mud, water). These obstructions affect the open-pit machines' length of trajectory, duration of movement and consumption of fuel. Observing the said problem, a model for optimizing the "movement" of open-pit auxiliary machinery has been developed and applied with ICT, namely GPS/GPRS and appropriate software solution, as presented herein. Model determines the "shortest" path of the machine to the job which can result in significant fuel savings and reducing failures of machines.
引用
收藏
页码:1152 / 1158
页数:7
相关论文
共 50 条
  • [1] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [2] Study on Optimization of Coal Truck Flow in Open-Pit Mine
    Bao, Haiming
    Zhang, Ruixin
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [3] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    [J]. EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [4] Optimized Transportation of the Open-pit Coal Mine
    Cai, Baijie
    Hao, Jianing
    Zhu, Huimin
    Chen, Hua
    [J]. Journal of Engineering Science and Technology Review, 2022, 15 (04) : 90 - 95
  • [5] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    [J]. FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [6] Open-Pit Mine Optimization with Maximum Satisfiability
    Matthew Deutsch
    [J]. Mining, Metallurgy & Exploration, 2019, 36 : 757 - 764
  • [7] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    [J]. MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764
  • [8] INTEGRATED OPEN-PIT COAL-MINE DESIGN
    BULLOCK, WD
    TOSNEY, JE
    MARTIN, PS
    [J]. CIM BULLETIN, 1976, 69 (768): : 55 - 62
  • [9] LANDSLIDE ON A FAULT IN AN OPEN-PIT COAL-MINE
    HANTZ, D
    LAVERSANNE, J
    [J]. LANDSLIDES, VOLS 1-3, 1988, : 655 - 659
  • [10] A study on movement characteristics and distribution law of dust particles in open-pit coal mine
    Tong Wu
    Zhuo Yang
    Aiai Wang
    Kai Zhang
    Bo Wang
    [J]. Scientific Reports, 11