SELFIE: ITER superconducting joint test facility

被引:4
|
作者
Girard, S. [1 ]
Lamaison, V. [1 ]
Torre, A. [1 ]
Decool, P. [1 ]
Dao, C. Nguyen Than [1 ]
Cerignat, S. [1 ]
Villecroze, F. [1 ]
Mouyon, D. [1 ]
Jiolat, G. [1 ]
Schild, T. [2 ]
Ilyin, Y. [2 ]
Wessel, W. A. J. [3 ]
Krooshoop, H. J. G. [3 ]
Leferink, J. [3 ]
Vermeer, C. H. [4 ]
Lubkemann, R. [4 ]
Nijhuis, A. [3 ,4 ]
机构
[1] CEA Cadarache IRFM STEP, F-13108 St Paul Les Durance, France
[2] ITER Org, Route Vinon Sur Verdon CS 90 046, F-90046 St Paul Les Durance, France
[3] Univ Twente, Fac Sci & Technol, Enschede, Netherlands
[4] Fdn SuperACT, Hengelo, Netherlands
关键词
Superconducting joint; Test facility; Superconducting transformer; ITER; Magnet assembly; Cryostat;
D O I
10.1016/j.fusengdes.2023.113434
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the frame of a contract with ITER Organization (IO) on magnets assembly support, CEA designed and built a superconducting joint test facility called SELFIE (ITER SELf-FIEld joint test facility). This facility is installed at CEA Cadarache and started to operate in 2022. This project was initiated by IO for quality control of critical assembly activities. Indeed, the magnet superconducting joints assembly is a special process, for which the performance cannot be verified until the full Tokamak is at cryogenic temperature and obviously repair cannot be envisaged once the machine is assembled. Therefore, the quality control of these joints assembly relies on procedures and qualification of the workers in charge of their implementation.As the joints assemblies will span over three years of the ITER construction, the qualified workers will have to assemble periodically some Production Proof Samples (PPS) joints to train and keep their certification valid. The purpose of SELFIE is to test these PPS in a timely manner. The tests scope is the measurement of the PPS resistance (few nOhms). For that purpose, PPS integrated in ITER conductors length (similar to 200 kg weight and 3600 mm length) are tested in a liquid helium bath (4.2 K), at nominal current (up to 70 kA), in self-field.The current is provided by a superconducting transformer integrated in the same cryostat as the sample.CEA finalized the preliminary design in 2019, complying with the requirement to achieve a full test sequence within one week (controlled cool down, test and warm-up), with an optimised operation cost. The detailed design phase was started in April 2020 followed by the manufacturing phase up to mid 2021. SELFIE integration and installation were achieved in December 2021 and the cold commissioning done in January 2022. This paper presents the SELFIE test facility and the first results.
引用
收藏
页数:5
相关论文
共 50 条
  • [41] The test facility for the KSTAR superconducting magnets at SAIT
    Baang, S
    Baek, SH
    Choi, HJ
    Chung, EJ
    Chang, YB
    Kim, JH
    Kim, JS
    Kim, K
    Kim, MK
    Kim, SB
    Kim, YJ
    Lee, SI
    Lee, SY
    Lee, YH
    Park, H
    Park, KR
    Winter, C
    Yoon, CS
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2000, 10 (01) : 645 - 648
  • [42] New facility to test superconducting accelerator magnets
    Lamm, M.J.
    DiMarco, J.
    Desavouret, E.
    Feher, S.
    Garvey, J.D.
    Hess, C.
    Limon, P.J.
    Nogiec, J.M.
    Orris, D.F.
    Pachnik, J.
    Peterson, T.
    Sharonov, S.
    Strait, J.B.
    Sylvester, C.
    Sim, J.W.
    Proceedings of the IEEE Particle Accelerator Conference, 1998, 3 : 3395 - 3397
  • [43] New Facility for the Cryogenic Test of ITER Current Leads at ASIPP
    Ding, Kaizhong
    Liu, Chenlian
    Bi, Yanfang
    Feng, Hansheng
    Du, Qingqing
    Zhou, Tingzhi
    Lu, Kun
    Song, Yuntao
    Xu, Liuwei
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2016, 26 (03)
  • [44] Superconducting magnet package for the TESLA test facility
    Koski, A
    Bandelmann, R
    Wolff, S
    IEEE TRANSACTIONS ON MAGNETICS, 1996, 32 (04) : 2155 - 2158
  • [45] Upgrade of the CERN Superconducting Magnet Test Facility
    Bajko, Marta
    Benda, Vladislav
    Bottura, Luca
    Broche, Alexandre Joel
    Coelingh, Gert-J.
    Formenti, Fabio
    Giannelli, Sebastiano
    Giloux, Christian
    Kosmicki, Antoine
    Perez, Consuelo Goncalves
    Perez-Duenas, E.
    Mertens, Volker
    De Rijk, Gijs
    Rossi, Lucio
    Dos Santos, Nuno
    Serio, Luigi
    Strychalski, Michal
    Thiesen, Hugues
    Craen, Arnaud Vande
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2017, 27 (04)
  • [46] The ITER Neutral Beam Test Facility towards SPIDER operation
    Toigo, V.
    Dal Bello, S.
    Gaio, E.
    Luchetta, A.
    Pasqualotto, R.
    Zaccaria, P.
    Bigi, M.
    Chitarin, G.
    Marcuzzi, D.
    Pomaro, N.
    Serianni, G.
    Agostinetti, P.
    Agostini, M.
    Antoni, V.
    Aprile, D.
    Baltador, C.
    Barbisan, M.
    Battistella, M.
    Boldrin, M.
    Brombin, M.
    Dalla Palma, M.
    De Lorenzi, A.
    Delogu, R.
    De Muri, M.
    Fellin, F.
    Ferro, A.
    Gambetta, G.
    Grando, L.
    Jain, P.
    Maistrello, A.
    Manduchi, G.
    Marconato, N.
    Pavei, M.
    Peruzzo, S.
    Pilan, N.
    Pimazzoni, A.
    Piovan, R.
    Recchia, M.
    Rizzolo, A.
    Sartori, E.
    Siragusa, M.
    Spada, E.
    Spagnolo, S.
    Spolaore, M.
    Taliercio, C.
    Valente, M.
    Veltri, P.
    Zamengo, A.
    Zaniol, B.
    Zanotto, L.
    NUCLEAR FUSION, 2017, 57 (08)
  • [47] Construction of ITER common test facility for CS model coil
    Shimamoto, S
    Hamada, K
    Kato, T
    Nakajima, H
    Isono, T
    Hiyama, T
    Oshikiri, M
    Kawano, K
    Sugimoto, M
    Koizumi, N
    Nunoya, K
    Seki, S
    Hanawa, H
    Wakabayashi, H
    Nishida, K
    Honda, T
    Matsui, H
    Uno, Y
    Takano, K
    Ando, T
    Nishi, M
    Takahashi, Y
    Sekiguchi, S
    Ohuchi, T
    Tajiri, F
    Okayama, J
    Takaya, Y
    Kawasaki, T
    Imahashi, K
    Ohtsu, K
    Tsuji, H
    IEEE TRANSACTIONS ON MAGNETICS, 1996, 32 (04) : 3049 - 3052
  • [48] Status Of PRIMA, The Test Facility For ITER Neutral Beam Injectors
    Sonato, P.
    Antoni, V.
    Bigi, M.
    Chitarin, G.
    Luchetta, A.
    Marcuzzi, D.
    Pasqualotto, R.
    Pomaro, N.
    Serianni, G.
    Toigo, V.
    Zaccaria, P.
    THIRD INTERNATIONAL SYMPOSIUM ON NEGATIVE IONS, BEAMS AND SOURCES (NIBS 2012), 2013, 1515 : 549 - 558
  • [49] A new facility to test superconducting accelerator magnets
    Lamm, MJ
    DiMarco, J
    Desavouret, E
    Feher, S
    Garvey, JD
    Hess, C
    Limon, PJ
    Nogiec, JM
    Orris, DF
    Pachnik, J
    Peterson, T
    Sharonov, S
    Strait, JB
    Sylvester, C
    Sim, JW
    Tartaglia, M
    Tompkins, JC
    Zlobin, AV
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3395 - 3397
  • [50] ITER Pre Compression Ring Test Facility FEM Analysis
    Reccia, Luigi
    Semeraro, Luigi
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2020, 30 (04)