SELFIE: ITER superconducting joint test facility

被引:4
|
作者
Girard, S. [1 ]
Lamaison, V. [1 ]
Torre, A. [1 ]
Decool, P. [1 ]
Dao, C. Nguyen Than [1 ]
Cerignat, S. [1 ]
Villecroze, F. [1 ]
Mouyon, D. [1 ]
Jiolat, G. [1 ]
Schild, T. [2 ]
Ilyin, Y. [2 ]
Wessel, W. A. J. [3 ]
Krooshoop, H. J. G. [3 ]
Leferink, J. [3 ]
Vermeer, C. H. [4 ]
Lubkemann, R. [4 ]
Nijhuis, A. [3 ,4 ]
机构
[1] CEA Cadarache IRFM STEP, F-13108 St Paul Les Durance, France
[2] ITER Org, Route Vinon Sur Verdon CS 90 046, F-90046 St Paul Les Durance, France
[3] Univ Twente, Fac Sci & Technol, Enschede, Netherlands
[4] Fdn SuperACT, Hengelo, Netherlands
关键词
Superconducting joint; Test facility; Superconducting transformer; ITER; Magnet assembly; Cryostat;
D O I
10.1016/j.fusengdes.2023.113434
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the frame of a contract with ITER Organization (IO) on magnets assembly support, CEA designed and built a superconducting joint test facility called SELFIE (ITER SELf-FIEld joint test facility). This facility is installed at CEA Cadarache and started to operate in 2022. This project was initiated by IO for quality control of critical assembly activities. Indeed, the magnet superconducting joints assembly is a special process, for which the performance cannot be verified until the full Tokamak is at cryogenic temperature and obviously repair cannot be envisaged once the machine is assembled. Therefore, the quality control of these joints assembly relies on procedures and qualification of the workers in charge of their implementation.As the joints assemblies will span over three years of the ITER construction, the qualified workers will have to assemble periodically some Production Proof Samples (PPS) joints to train and keep their certification valid. The purpose of SELFIE is to test these PPS in a timely manner. The tests scope is the measurement of the PPS resistance (few nOhms). For that purpose, PPS integrated in ITER conductors length (similar to 200 kg weight and 3600 mm length) are tested in a liquid helium bath (4.2 K), at nominal current (up to 70 kA), in self-field.The current is provided by a superconducting transformer integrated in the same cryostat as the sample.CEA finalized the preliminary design in 2019, complying with the requirement to achieve a full test sequence within one week (controlled cool down, test and warm-up), with an optimised operation cost. The detailed design phase was started in April 2020 followed by the manufacturing phase up to mid 2021. SELFIE integration and installation were achieved in December 2021 and the cold commissioning done in January 2022. This paper presents the SELFIE test facility and the first results.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] TEST FACILITY FOR LARGE SUPERCONDUCTING STRIPS
    WITTGENSTEIN, F
    FELDMANN, M
    HERVE, A
    CRYOGENICS, 1969, 9 (03) : 158 - +
  • [22] Tritium monitoring in the ITER neutral beam test facility
    Loughlin, M. J.
    Lawrence, G.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 646 - 651
  • [23] Cold Test Facility for the ITER Central Solenoid Coils
    Mann, T. L.
    Martovetsky, N.
    Hatfield, D.
    Kenney, S.
    Miller, J.
    Kynoch, J.
    Bai, H.
    Bird, M.
    2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 225 - +
  • [24] Maintenance schemes for the ITER neutral beam test facility
    Zaccaria, P
    Dal Bello, S
    Marcuzzi, D
    Masiello, A
    Cordier, JJ
    Hemsworth, R
    Antipenkov, A
    Day, C
    Dremel, M
    Mack, A
    Jones, T
    Coniglio, A
    Pillon, M
    Sandri, S
    Speth, E
    Tanga, A
    Antoni, V
    Di Pietro, E
    Mondino, PL
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 255 - 259
  • [25] Installation and commisionning of the EU test facility for ITER gyrotrons
    Fasel, D.
    Alberti, S.
    Bonicelli, T.
    Droz, E.
    Goodman, T.
    Henderson, M. -A.
    Hogge, J. P.
    Lobet, X. L.
    Marletaz, B.
    Marmillod, Ph.
    Perez, A.
    Porte, L.
    Siravo, U.
    Tran, M. Q.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 881 - 886
  • [26] Achievements of the ELISE test facility in view of the ITER NBI
    Heinemann, B.
    Wuenderlich, D.
    Kraus, W.
    Bonomo, F.
    Fantz, U.
    Froeschle, M.
    Mario, I
    Riedl, R.
    Wimmer, C.
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 455 - 459
  • [27] Final design of ITER port plug test facility
    Cerisier, Thierry
    Levesy, Bruno
    Romannikov, Alexander
    Rumyantsev, Yuri
    Cordier, Jean-Jacques
    Dammann, Alexis
    Minakov, Victor
    Rosales, Natalya
    Mitrofanova, Elena
    Portone, Sergey
    Mironova, Ekaterina
    FUSION ENGINEERING AND DESIGN, 2016, 109 : 1153 - 1157
  • [28] The ITER Central Solenoid Module final test facility
    Schaubel, K.
    Langhorn, A.
    Lloyd, S.
    Piec, Z.
    Salazar, E.
    Smith, J.
    FUSION ENGINEERING AND DESIGN, 2017, 124 : 59 - 63
  • [29] Safety systems in the ITER neutral beam test facility
    Dal Bello, Samuele
    Battistella, Manuela
    Grando, Luca
    Luchetta, Adriano
    Moressa, Modesto
    Breda, Mauro
    Svensson, Lennart
    Paolucci, Francesco
    Labate, Carmelo Vincenzo
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 246 - 249
  • [30] Design progress on ITER port plug test facility
    Levesy, B.
    Beaumont, B.
    Bruno, L.
    Cerisier, T.
    Cordier, J. J.
    Dammann, A.
    Giancarli, L.
    Henderson, M.
    Romannikov, A.
    Rumyantsev, Y.
    Udintsev, V. S.
    FUSION ENGINEERING AND DESIGN, 2012, 87 (7-8) : 1060 - 1064