SELFIE: ITER superconducting joint test facility

被引:4
|
作者
Girard, S. [1 ]
Lamaison, V. [1 ]
Torre, A. [1 ]
Decool, P. [1 ]
Dao, C. Nguyen Than [1 ]
Cerignat, S. [1 ]
Villecroze, F. [1 ]
Mouyon, D. [1 ]
Jiolat, G. [1 ]
Schild, T. [2 ]
Ilyin, Y. [2 ]
Wessel, W. A. J. [3 ]
Krooshoop, H. J. G. [3 ]
Leferink, J. [3 ]
Vermeer, C. H. [4 ]
Lubkemann, R. [4 ]
Nijhuis, A. [3 ,4 ]
机构
[1] CEA Cadarache IRFM STEP, F-13108 St Paul Les Durance, France
[2] ITER Org, Route Vinon Sur Verdon CS 90 046, F-90046 St Paul Les Durance, France
[3] Univ Twente, Fac Sci & Technol, Enschede, Netherlands
[4] Fdn SuperACT, Hengelo, Netherlands
关键词
Superconducting joint; Test facility; Superconducting transformer; ITER; Magnet assembly; Cryostat;
D O I
10.1016/j.fusengdes.2023.113434
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the frame of a contract with ITER Organization (IO) on magnets assembly support, CEA designed and built a superconducting joint test facility called SELFIE (ITER SELf-FIEld joint test facility). This facility is installed at CEA Cadarache and started to operate in 2022. This project was initiated by IO for quality control of critical assembly activities. Indeed, the magnet superconducting joints assembly is a special process, for which the performance cannot be verified until the full Tokamak is at cryogenic temperature and obviously repair cannot be envisaged once the machine is assembled. Therefore, the quality control of these joints assembly relies on procedures and qualification of the workers in charge of their implementation.As the joints assemblies will span over three years of the ITER construction, the qualified workers will have to assemble periodically some Production Proof Samples (PPS) joints to train and keep their certification valid. The purpose of SELFIE is to test these PPS in a timely manner. The tests scope is the measurement of the PPS resistance (few nOhms). For that purpose, PPS integrated in ITER conductors length (similar to 200 kg weight and 3600 mm length) are tested in a liquid helium bath (4.2 K), at nominal current (up to 70 kA), in self-field.The current is provided by a superconducting transformer integrated in the same cryostat as the sample.CEA finalized the preliminary design in 2019, complying with the requirement to achieve a full test sequence within one week (controlled cool down, test and warm-up), with an optimised operation cost. The detailed design phase was started in April 2020 followed by the manufacturing phase up to mid 2021. SELFIE integration and installation were achieved in December 2021 and the cold commissioning done in January 2022. This paper presents the SELFIE test facility and the first results.
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Test Results of RF ITER TF Conductors in the SULTAN Test Facility
    Tronza, V. I.
    Lelekhov, S. A.
    Stepanov, B.
    Bruzzone, P.
    Kaverin, D. S.
    Shutov, K. A.
    Vysotsky, V. S.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2014, 24 (03)
  • [32] TEST-RESULTS OF THE FER ITER CONDUCTORS IN THE FENIX TEST FACILITY
    SUGIMOTO, M
    ISONO, T
    KOIZUMI, K
    TAKAHASHI, Y
    NISHI, M
    OKUNO, K
    YOSHIDA, K
    NAKAJIMA, H
    ANDO, T
    HOSONO, F
    WAKABAYASHI, H
    TSUJI, H
    SHEN, S
    FELKER, B
    HASSENZAHL, W
    IEEE TRANSACTIONS ON MAGNETICS, 1994, 30 (04) : 2042 - 2045
  • [33] CICC Joint Development and Test for the Test Facility
    武玉
    翁佩德
    Plasma Science & Technology, 2005, (01) : 2629 - 2631
  • [34] CICC joint development and test for the test facility
    Yu, W
    Weng, P
    PLASMA SCIENCE & TECHNOLOGY, 2005, 7 (01) : 2629 - 2631
  • [35] A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility
    Toigo, V.
    Piovan, R.
    Dal Bello, S.
    Gaio, E.
    Luchetta, A.
    Pasqualotto, R.
    Zaccaria, P.
    Bigi, M.
    Chitarin, G.
    Marcuzzi, D.
    Pomaro, N.
    Serianni, G.
    Agostinetti, P.
    Agostini, M.
    Antoni, V.
    Aprile, D.
    Baltador, C.
    Barbisan, M.
    Battistella, M.
    Boldrin, M.
    Brombin, M.
    Dalla Palma, M.
    De Lorenzi, A.
    Delogu, R.
    De Muri, M.
    Fellin, F.
    Ferro, A.
    Finotti, C.
    Fiorentin, A.
    Gambetta, G.
    Gnesotto, F.
    Grando, L.
    Jain, P.
    Maistrello, A.
    Manduchi, G.
    Marconato, N.
    Moresco, M.
    Ocello, E.
    Pavei, M.
    Peruzzo, S.
    Pilan, N.
    Pimazzoni, A.
    Recchia, M.
    Rizzolo, A.
    Rostagni, G.
    Sartori, E.
    Siragusa, M.
    Sonato, P.
    Sottocornola, A.
    Spada, E.
    FUSION ENGINEERING AND DESIGN, 2017, 123 : 32 - 39
  • [36] Installation and Test Programme of the ITER Poloidal Field Conductor Insert (PFCI) in the ITER Test Facility at JAEA Naka
    Nunoya, Yoshihiko
    Takahashi, Yoshikazu
    Hamada, Kazuya
    Isono, Takaaki
    Matsui, Kunihiro
    Oshikiri, Masayuki
    Nabara, Yoshihiro
    Hemmi, Tsutomu
    Nakajima, Hideo
    Kawano, Katsumi
    Tsutsumi, Fumiaki
    Takano, Katsutoshi
    Uno, Yasuhiro
    Koizumi, Norikiyo
    Okuno, Kiyoshi
    Baker, William
    Salpietro, Ettore
    Rajainmaki, Hannu
    Sborchia, Carlo
    Mitchell, Neil
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) : 1492 - 1495
  • [37] Development and test of the static magnetic field test facility for the ITER Tokamak building
    Wang, Shusheng
    Gao, Ge
    Wang, Linsen
    Jiang, Qian
    FUSION ENGINEERING AND DESIGN, 2023, 191
  • [38] Construction and commissioning test results of the test facility for the ITER CS Model Coil
    Nakajima, H
    Hiyama, T
    Kato, T
    Kawano, K
    Isono, T
    Sugimoto, M
    Koizumi, N
    Hamada, K
    Nunoya, Y
    Matsui, H
    Oshikiri, M
    Hanawa, H
    Seki, S
    Wakabayashi, H
    Takano, K
    Uno, Y
    Honda, T
    Nishida, K
    Ito, T
    Sekiguchi, S
    Ohuchi, T
    Tajiri, F
    Okayama, J
    Takaya, Y
    Kawasaki, T
    Imahashi, K
    Ohotsu, K
    Ando, T
    Takahashi, Y
    Nishi, M
    Tsuji, H
    Shimamoto, S
    FUSION TECHNOLOGY, 1996, 30 (03): : 1248 - 1252
  • [39] An Indian test facility to characterise diagnostic neutral beam for ITER
    Singh, M. J.
    Bandyopadhyay, M.
    Rotti, C.
    Singh, N. P.
    Shah, Sejal
    Bansal, G.
    Gahlaut, A.
    Soni, J.
    Lakdawala, H.
    Waghela, Harshad
    Ahmed, I.
    Roopesh, G.
    Baruah, U. K.
    Chakraborty, A. K.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 732 - 735
  • [40] EPICS - MDSplus integration in the ITER Neutral Beam Test Facility
    Luchetta, Adriano
    Manduchi, Gabriele
    Barbalace, Antonio
    Soppelsa, Anton
    Taliercio, Cesare
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 1252 - 1255