SELFIE: ITER superconducting joint test facility

被引:4
|
作者
Girard, S. [1 ]
Lamaison, V. [1 ]
Torre, A. [1 ]
Decool, P. [1 ]
Dao, C. Nguyen Than [1 ]
Cerignat, S. [1 ]
Villecroze, F. [1 ]
Mouyon, D. [1 ]
Jiolat, G. [1 ]
Schild, T. [2 ]
Ilyin, Y. [2 ]
Wessel, W. A. J. [3 ]
Krooshoop, H. J. G. [3 ]
Leferink, J. [3 ]
Vermeer, C. H. [4 ]
Lubkemann, R. [4 ]
Nijhuis, A. [3 ,4 ]
机构
[1] CEA Cadarache IRFM STEP, F-13108 St Paul Les Durance, France
[2] ITER Org, Route Vinon Sur Verdon CS 90 046, F-90046 St Paul Les Durance, France
[3] Univ Twente, Fac Sci & Technol, Enschede, Netherlands
[4] Fdn SuperACT, Hengelo, Netherlands
关键词
Superconducting joint; Test facility; Superconducting transformer; ITER; Magnet assembly; Cryostat;
D O I
10.1016/j.fusengdes.2023.113434
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the frame of a contract with ITER Organization (IO) on magnets assembly support, CEA designed and built a superconducting joint test facility called SELFIE (ITER SELf-FIEld joint test facility). This facility is installed at CEA Cadarache and started to operate in 2022. This project was initiated by IO for quality control of critical assembly activities. Indeed, the magnet superconducting joints assembly is a special process, for which the performance cannot be verified until the full Tokamak is at cryogenic temperature and obviously repair cannot be envisaged once the machine is assembled. Therefore, the quality control of these joints assembly relies on procedures and qualification of the workers in charge of their implementation.As the joints assemblies will span over three years of the ITER construction, the qualified workers will have to assemble periodically some Production Proof Samples (PPS) joints to train and keep their certification valid. The purpose of SELFIE is to test these PPS in a timely manner. The tests scope is the measurement of the PPS resistance (few nOhms). For that purpose, PPS integrated in ITER conductors length (similar to 200 kg weight and 3600 mm length) are tested in a liquid helium bath (4.2 K), at nominal current (up to 70 kA), in self-field.The current is provided by a superconducting transformer integrated in the same cryostat as the sample.CEA finalized the preliminary design in 2019, complying with the requirement to achieve a full test sequence within one week (controlled cool down, test and warm-up), with an optimised operation cost. The detailed design phase was started in April 2020 followed by the manufacturing phase up to mid 2021. SELFIE integration and installation were achieved in December 2021 and the cold commissioning done in January 2022. This paper presents the SELFIE test facility and the first results.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] ITER Magnets Superconducting Joints Prototype Tests in the CEA SELFIE Facility for Operators Qualification
    Dao, C. Nguyen Thanh
    Boudes, B.
    Che, T.
    Girard, S.
    Gung, C.
    Ilyin, Y.
    Jiolat, G.
    Kim, H.
    Liu, K.
    Miyoshi, Y.
    Schild, T.
    Shao, L.
    Torre, A.
    Zhu, H.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (05) : 1 - 5
  • [2] FENIX, A TEST FACILITY FOR ITER AND OTHER NEW SUPERCONDUCTING MAGNETS
    SLACK, DS
    PATRICK, RE
    MILLER, JR
    IEEE TRANSACTIONS ON MAGNETICS, 1991, 27 (02) : 1835 - 1838
  • [3] The cryogenic system for ITER CC superconducting conductor test facility
    Peng, Jinqing
    Wu, Yu
    Liu, Huajun
    Shi, Yi
    Chen, Jinglin
    Ren, Zhibin
    CRYOGENICS, 2011, 51 (01) : 62 - 67
  • [4] Superconducting Feeder System for ITER Central Solenoid Module Final Test Facility
    Piec, Zbigniew
    Ding, Kaizhong
    Kun, Lu
    Langhorn, Alan
    Lloyd, S.
    Salazar, Erica
    Schaubel, Kurt
    Smith, John
    Zhou, Tingzhi
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2018, 28 (03)
  • [5] Electromagnetic and Stress Analysis of 50 kA Superconducting Transformer for ITER Conductor Test Facility
    施毅
    武玉
    武松涛
    刘华军
    陈敬林
    彭晋卿
    Plasma Science and Technology, 2010, (04) : 506 - 512
  • [6] Electromagnetic and Stress Analysis of 50 kA Superconducting Transformer for ITER Conductor Test Facility
    Shi Yi
    Wu Yu
    Wu Songtao
    Liu Huajun
    Chen Jinglin
    Peng Jinqing
    PLASMA SCIENCE & TECHNOLOGY, 2010, 12 (04) : 506 - 512
  • [7] Electromagnetic and Stress Analysis of 50 kA Superconducting Transformer for ITER Conductor Test Facility
    施毅
    武玉
    武松涛
    刘华军
    陈敬林
    彭晋卿
    Plasma Science and Technology, 2010, 12 (04) : 506 - 512
  • [8] ITER primary cryopump test facility
    Petersohn, N
    Boissin, JC
    Murdoch, D
    Mack, A
    FUSION ENGINEERING AND DESIGN, 1998, 39-40 : 949 - 954
  • [9] ITER primary cryopump test facility
    Petersohn, N.
    Boissin, J.C.
    Murdoch, D.
    Mack, A.
    Fusion Engineering and Design, 1998, 39-40 (Pt A): : 949 - 954
  • [10] Qualification of ITER Correction Coil Superconducting Joint
    Wang, Lin
    Wu, Weiyue
    Wei, Jing
    Ilyin, Yuri
    Dolgetta, Nello
    Simon, Fabrice
    Libeyre, Paul
    Santillana, Ignacio Aviles
    Langeslag, Stefanie
    Sgobba, Stefano
    Bernard, Turck
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2018, 46 (09) : 3223 - 3228