A new proactive and reactive approach for resource-constrained project scheduling problem under activity and resource disruption: a scenario-based robust optimization approach

被引:1
|
作者
Khoshsirat, Maziar [1 ]
Mousavi, Seyed Meysam [1 ]
机构
[1] Shahed Univ, Dept Ind Engn, Tehran, Iran
关键词
Multi-mode resource-constrained project scheduling; Disruption; Resiliency; Proactive and reactive scheduling; Scenario-based robust optimization; Hybrid multi-objective method; PORTFOLIO SELECTION; MODEL; POLICIES;
D O I
10.1007/s10479-024-05895-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper introduces a novel two-phase framework for designing a proactive-reactive scheduling model in the multi-mode resource-constrained project scheduling problem under disruptions. The proactive phase involves constructing a resilient baseline scheduling model using a mixed-integer linear programming model. This phase contributes to a multi-objective model that minimizes the project completion time and total project cost while maximizing resilience criteria. In this context, resilience refers to allocating float time to project activities to protect their start and finish times against future disruptions as much as possible. The reactive phase involves a bi-objective mathematical model that mitigates the impact of disruptions through preempt-repeat, preempt-resume, and activity-crashing strategies. Real-world projects involve many uncertain parameters that can negatively affect the optimization of rescheduling problems if overlooked. Therefore, for the first time, a scenario-based robust optimization approach is proposed to cope with the uncertainty of the reactive phase. Additionally, a novel hybrid multi-objective method based on goal programming is introduced to solve the proposed multi-objective model. Finally, to demonstrate the capability of the proposed approach, an oil and gas project in Iran is regarded as a real case study. The results indicate that the negative impact of disruptions on the makespan and total cost of the project can be largely mitigated by considering resilience criteria in the proactive phase and preempt-repeat, preempt-resume, and activity-crashing strategies in the reactive phase.
引用
收藏
页码:597 / 643
页数:47
相关论文
共 50 条
  • [1] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    [J]. KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [2] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    [J]. Journal of Scheduling, 2019, 22 : 211 - 237
  • [3] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237
  • [4] A lexicographic approach to the robust resource-constrained project scheduling problem
    Palacio, Juan D.
    Larrea, Olga L.
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2017, 24 (1-2) : 143 - 157
  • [5] A robust optimization approach for the multi-mode resource-constrained project scheduling problem
    Balouka, Noemie
    Cohen, Izack
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 457 - 470
  • [6] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [7] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
  • [8] Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    [J]. ANNALS OF OPERATIONS RESEARCH, 2019, 274 (1-2) : 187 - 210
  • [9] Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    [J]. Annals of Operations Research, 2019, 274 : 187 - 210
  • [10] A Population-Based Approach to the Resource-Constrained Project Scheduling Problem
    Vicente Valls
    Francisco Ballestín
    Sacramento Quintanilla
    [J]. Annals of Operations Research, 2004, 131 : 305 - 324