A lexicographic approach to the robust resource-constrained project scheduling problem

被引:17
|
作者
Palacio, Juan D. [1 ]
Larrea, Olga L. [1 ]
机构
[1] Inst Tecnol Metropolitano, Fac Ciencias Econ & Adm, Dept Calidad & Prod, Calle 73,76A-354, Medellin, Colombia
关键词
project scheduling; resource constrained; robust scheduling; mixed-integer linear programming; ALGORITHM; ASSIGNMENT; MODEL;
D O I
10.1111/itor.12301
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem (RCPSP) is one of the most studied problems in the context of project scheduling. Given the NP-hardness nature of the problem, the RCPSP has been solved mainly using heuristics. Moreover, most of the studies consider a single objective for the problem. This paper presents an exact approach based on two mixed-integer linear programming (MILP) models to solve the RCPSP. The first MILP aims to minimize makespan, while the second MILP maximizes the robustness of the schedule. The mathematical formulations are solved using a lexicographic approach. We illustrate the effectiveness of the proposed models by solving standard instances for the RCPSP available in the project scheduling problems library (PSLIB) library. Computational results show that it is possible to find alternate optimal solutions with the maximum robustness subject to the minimum makespan for instances with up to 90 activities.
引用
收藏
页码:143 / 157
页数:15
相关论文
共 50 条
  • [1] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [2] A robust optimization approach for the multi-mode resource-constrained project scheduling problem
    Balouka, Noemie
    Cohen, Izack
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 457 - 470
  • [3] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu, Xuejun
    Liang, Sheng
    Wang, Jianjiang
    Cui, Nanfang
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [4] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    [J]. ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [5] A Boolean satisfiability approach to the resource-constrained project scheduling problem
    Andrei Horbach
    [J]. Annals of Operations Research, 2010, 181 : 89 - 107
  • [6] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    [J]. Annals of Operations Research, 2008, 157 : 25 - 36
  • [7] A Boolean satisfiability approach to the resource-constrained project scheduling problem
    Horbach, Andrei
    [J]. ANNALS OF OPERATIONS RESEARCH, 2010, 181 (01) : 89 - 107
  • [8] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    [J]. IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [9] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    [J]. KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [10] Resource-constrained project scheduling problem with reworking
    Liao, Yina
    Lu, Zhiqiang
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774