Flexible job shop scheduling with preventive maintenance consideration

被引:7
|
作者
Wocker, Michael Mario [1 ,4 ]
Ostermeier, Frederik Ferid [1 ,5 ]
Wanninger, Tobias [3 ]
Zwinkau, Ronny [1 ]
Deuse, Jochen [1 ,2 ]
机构
[1] TU Dortmund Univ, Inst Prod Syst, Leonhard Euler Str 5, D-44227 Dortmund, Germany
[2] Univ Technol Sydney, Ctr Adv Mfg, Sydney, Australia
[3] Tech Univ Munich, Lab Prod Dev & Lightweight Design, Boltzmannstr 15, D-85748 Munich, Germany
[4] BMW Grp, Knorrstr 147, D-80937 Munich, Germany
[5] BMW Grp, Bremer Str 6, D-80807 Munich, Germany
关键词
Manufacturing; Flexible job shop; Scheduling; Preventive maintenance; Local search algorithm; PARALLEL MACHINE; GRASP ALGORITHM; OPTIMIZATION; AVAILABILITY;
D O I
10.1007/s10845-023-02114-3
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In highly automated manufacturing systems running 24/7, preventive maintenance activities need to be executed during production times. Flexible job shops with several identical machines generally bear the potential to compensate temporary machine unavailability times caused by preventive maintenance without a considerable increase of the makespan due to machine paralleling. However, this requires sophisticated scheduling of manufacturing jobs and the assignment of maintenance activities over the scheduling horizon. This work, therefore, introduces a mixed-integer program that models both job scheduling and maintenance activity assignment. A local search algorithm is developed to solve both problems in an integrated way. Numerical studies are carried out based on data from a real flexible job shop in the automotive industry with 78 machines and four products. The results show that joint job scheduling and maintenance activity assignment is required to obtain a makespan similar to the makespan without maintenance consideration. Non-sophisticated scheduling of maintenance windows can increase the makespan by more than 20 percentage points compared to sophisticated scheduling. Besides, we show that only a limited amount of maintenance activities can be compensated and that higher unavailability times will inevitably lead to detrimental effects on the makespan unless maintenance worker capacity is increased.
引用
收藏
页码:1517 / 1539
页数:23
相关论文
共 50 条
  • [21] Flexible job shop scheduling with blockages
    R. S. Hansmann
    T. Rieger
    U. T. Zimmermann
    Mathematical Methods of Operations Research, 2014, 79 : 135 - 161
  • [22] An effective heuristic for flexible job-shop scheduling problem with maintenance activities
    Wang, Shijin
    Yu, Jianbo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (03) : 436 - 447
  • [23] Integrated Optimization of Flexible Job Shop Scheduling Problem and Equipment Maintenance Plan
    Zha Jing
    Jin Hua
    Pan Zhicheng
    Yuan Qingsong
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING 2015 (ICMMCCE 2015), 2015, 39 : 1207 - 1212
  • [24] Analysis of Integrated Preventive Maintenance and Machine Failure in Stochastic Flexible Job Shop Scheduling with Sequence-dependent Setup Time
    Gupta, Shrajal
    Jain, Ajai
    SMART SCIENCE, 2022, 10 (03) : 175 - 197
  • [25] A multi-agent system for integrated scheduling and maintenance planning of the flexible job shop
    Pal, Manojkumar
    Mittal, Murari Lal
    Soni, Gunjan
    Chouhan, Satyendra S.
    COMPUTERS & OPERATIONS RESEARCH, 2023, 159
  • [26] Job-shop scheduling problem with energy consideration
    Masmoudi, Oussama
    Delorme, Xavier
    Gianessi, Paolo
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 216 : 12 - 22
  • [27] Scheduling fuzzy job shop with preventive maintenance through swarm-based neighborhood search
    Lei, Demion
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (9-12): : 1121 - 1128
  • [28] Optimal scheduling for flexible job shop operation
    Gomes, MC
    Barbosa-Póvoa, AP
    Novais, AQ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (11) : 2323 - 2353
  • [29] Flexible job shop scheduling with overlapping in operations
    Fattahi, Parviz
    Jolai, Fariborz
    Arkat, Jamal
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (07) : 3076 - 3087
  • [30] Study on Scheduling Optimization for Flexible Job Shop
    Liu, Xiaoxia
    Liu, Chunbo
    Tao, Ze
    ADVANCED MECHANICAL ENGINEERING, PTS 1 AND 2, 2010, 26-28 : 821 - +