An effective heuristic for flexible job-shop scheduling problem with maintenance activities

被引:108
|
作者
Wang, Shijin [1 ]
Yu, Jianbo [2 ]
机构
[1] Tongji Univ, Dept Management Sci & Engn, Sch Econ & Management, Shanghai 200092, Peoples R China
[2] Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai 200072, Peoples R China
基金
美国国家科学基金会;
关键词
Flexible job-shop scheduling problem; Availability constraints; Filtered beam search; Preventive maintenance; FILTERED-BEAM-SEARCH; 2 PARALLEL MACHINES; PREVENTIVE MAINTENANCE; SINGLE-MACHINE; FLOW-SHOP; MAKESPAN MINIMIZATION; GENETIC ALGORITHMS; AVAILABILITY; OPTIMIZATION; SUBJECT;
D O I
10.1016/j.cie.2010.05.016
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Most production scheduling problems, including the standard flexible job-shop scheduling problem (FJSP), assume that machines are continuously available. However, in most realistic situations, machines may become unavailable during certain periods due to preventive maintenance (PM). In this paper, a flexible job-shop scheduling problem with machine availability constraints is considered. Each machine is subject to preventive maintenance during the planning period and the starting times of maintenance activities are either flexible in a time window or fixed beforehand. Moreover, two cases of maintenance resource constraint are considered: sufficient maintenance resource available or only one maintenance resource available. To deal with this variant FJSP problem with maintenance activities, a filtered beam search (FBS) based heuristic algorithm is proposed. With a modified branching scheme, the machine availability constraint and maintenance resource constraint can be easily incorporated into the proposed algorithm. Simulation experiments are conducted on some representative problems. The results demonstrate that the proposed filtered beam search based heuristic algorithm is a viable and effective approach for the FJSP with maintenance activities. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:436 / 447
页数:12
相关论文
共 50 条
  • [1] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Mohsen Ziaee
    [J]. The Journal of Supercomputing, 2014, 67 : 69 - 83
  • [2] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Ziaee, Mohsen
    [J]. JOURNAL OF SUPERCOMPUTING, 2014, 67 (01): : 69 - 83
  • [3] An effective genetic algorithm for the flexible job-shop scheduling problem
    Zhang, Guohui
    Gao, Liang
    Shi, Yang
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3563 - 3573
  • [4] An Efficient Heuristic Algorithm for Flexible Job-Shop Scheduling Problem with Due Windows
    Ai, Yi
    Wang, Mengying
    Xue, Xiaoguang
    Yan, Chao-Bo
    [J]. 2022 IEEE 18TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2022, : 142 - 147
  • [5] A Constructive Heuristic for Solving the Job-Shop Scheduling Problem
    Mellado, R.
    Cubillos, C.
    Cabrera, D.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2016, 14 (06) : 2758 - 2763
  • [6] A new heuristic method for job-shop scheduling problem
    Kuang-Ping Liu
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3708 - 3714
  • [7] Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities
    Li, Jun-qing
    Pan, Quan-ke
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (01) : 4 - 17
  • [8] An effective artificial bee colony algorithm for the flexible job-shop scheduling problem
    Ling Wang
    Gang Zhou
    Ye Xu
    Shengyao Wang
    Min Liu
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 60 : 303 - 315
  • [9] An effective artificial bee colony algorithm for the flexible job-shop scheduling problem
    Wang, Ling
    Zhou, Gang
    Xu, Ye
    Wang, Shengyao
    Liu, Min
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (1-4): : 303 - 315
  • [10] An effective particle swarm optimization algorithm for flexible job-shop scheduling problem
    Nouiri, Maroua
    Jemai, Abderezak
    Ammari, Ahmed Chiheb
    Bekrar, Abdelghani
    Niar, Smail
    [J]. PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 29 - 34