Flexible job shop scheduling with preventive maintenance consideration

被引:7
|
作者
Wocker, Michael Mario [1 ,4 ]
Ostermeier, Frederik Ferid [1 ,5 ]
Wanninger, Tobias [3 ]
Zwinkau, Ronny [1 ]
Deuse, Jochen [1 ,2 ]
机构
[1] TU Dortmund Univ, Inst Prod Syst, Leonhard Euler Str 5, D-44227 Dortmund, Germany
[2] Univ Technol Sydney, Ctr Adv Mfg, Sydney, Australia
[3] Tech Univ Munich, Lab Prod Dev & Lightweight Design, Boltzmannstr 15, D-85748 Munich, Germany
[4] BMW Grp, Knorrstr 147, D-80937 Munich, Germany
[5] BMW Grp, Bremer Str 6, D-80807 Munich, Germany
关键词
Manufacturing; Flexible job shop; Scheduling; Preventive maintenance; Local search algorithm; PARALLEL MACHINE; GRASP ALGORITHM; OPTIMIZATION; AVAILABILITY;
D O I
10.1007/s10845-023-02114-3
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In highly automated manufacturing systems running 24/7, preventive maintenance activities need to be executed during production times. Flexible job shops with several identical machines generally bear the potential to compensate temporary machine unavailability times caused by preventive maintenance without a considerable increase of the makespan due to machine paralleling. However, this requires sophisticated scheduling of manufacturing jobs and the assignment of maintenance activities over the scheduling horizon. This work, therefore, introduces a mixed-integer program that models both job scheduling and maintenance activity assignment. A local search algorithm is developed to solve both problems in an integrated way. Numerical studies are carried out based on data from a real flexible job shop in the automotive industry with 78 machines and four products. The results show that joint job scheduling and maintenance activity assignment is required to obtain a makespan similar to the makespan without maintenance consideration. Non-sophisticated scheduling of maintenance windows can increase the makespan by more than 20 percentage points compared to sophisticated scheduling. Besides, we show that only a limited amount of maintenance activities can be compensated and that higher unavailability times will inevitably lead to detrimental effects on the makespan unless maintenance worker capacity is increased.
引用
收藏
页码:1517 / 1539
页数:23
相关论文
共 50 条
  • [1] Flexible job shop scheduling with preventive maintenance consideration
    Michael Mario Wocker
    Frederik Ferid Ostermeier
    Tobias Wanninger
    Ronny Zwinkau
    Jochen Deuse
    Journal of Intelligent Manufacturing, 2024, 35 : 1517 - 1539
  • [2] Partial flexible job shop scheduling considering preventive maintenance and priorities
    Farahani, Ameneh
    Tohidi, Hamid
    Khalaj, Mehran
    Shoja, Ahmad
    WPOM-WORKING PAPERS ON OPERATIONS MANAGEMENT, 2020, 11 (02): : 27 - 48
  • [3] Energy-efficient Optimization of Flexible Job Shop Scheduling and Preventive Maintenance
    Mirahmadi, Nasim
    Taghipour, Sharareh
    2019 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS 2019) - R & M IN THE SECOND MACHINE AGE - THE CHALLENGE OF CYBER PHYSICAL SYSTEMS, 2019,
  • [4] MILP modeling and optimization of flexible job shop scheduling problem with preventive maintenance
    Zhao, Lixin
    Cheng, Weiyao
    Meng, Leilei
    Zhang, Chaoyong
    Ren, Yaping
    Zhang, Biao
    Duan, Peng
    Computers and Industrial Engineering, 2025, 201
  • [5] Energy Saving Optimization Method of Flexible Job Shop Scheduling Considering Preventive Maintenance
    考虑设备预维护的柔性作业车间调度节能优化方法
    Li, Congbo (congboli@cqu.edu.cn), 1600, Chinese Mechanical Engineering Society (57): : 220 - 230
  • [6] Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance
    Thornblad, Karin
    Stromberg, Ann-Brith
    Patriksson, Michael
    Almgren, Torgny
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (01) : 126 - 145
  • [7] Integrated Optimization of Preventive Maintenance and Flexible Job Shop Group Scheduling Based on an ABC-AN Algorithm
    Liu Q.
    Liu J.
    Liu J.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2023, 59 (12): : 89 - 96
  • [8] Impact of Preventive Maintenance and Machine Breakdown on Performance of Stochastic Flexible Job Shop Scheduling with Setup Time
    Gupta, Shrajal
    Jain, Ajai
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2022, 81 (11): : 1195 - 1203
  • [9] SIMULTANEOUS JOB-SHOP SCHEDULING AND MAINTENANCE PLANNING WITH ENERGY CONSIDERATION
    Gupta, Shrajal
    Jain, Ajai
    IFAC PAPERSONLINE, 2022, 55 (10): : 181 - 186
  • [10] Joint optimization of flexible job shop scheduling and preventive maintenance under high-frequency production switching
    Wang, Yu
    Xia, Tangbin
    Xu, Yuhui
    Ding, Yutong
    Zheng, Meimei
    Pan, Ershun
    Xi, Lifeng
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2024, 269