Quantitative Risk Assessment Model and Optimization in Infrastructure Fast-Track Construction Projects

被引:3
|
作者
Martins, Claudia Garrido [1 ]
Bogus, Susan M. [2 ]
Valentin, Vanessa [2 ]
机构
[1] Univ North Carolina Charlotte, Dept Engn Technol & Construct Management, Charlotte, NC 28223 USA
[2] Univ New Mexico, Dept Civil Construct & Environm Engn, Albuquerque, NM 87131 USA
关键词
risk assessment; fast-track; overlapping; optimization; infrastructure; construction; project; TIME;
D O I
10.3390/infrastructures8040078
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry has extensively applied the fast-tracking approach to the demanding need for the fast delivery of infrastructure projects. However, the fast-track strategy might be threatened by distinctive risks or changes in risk characteristics that emerge when activities are overlapped (overlapping risks). This article proposes a risk assessment simulation model to quantify the economic impact of overlapping risks on fast-track infrastructure projects. The model uses Monte Carlo simulation and a proprietary engine solution for the optimization procedure. It quantifies the overlapping risk impacts in the project duration and cost that could originate in three different overlapping degrees and evaluates the optimal overlapping degree to reduce the impact of the overlapping risks. The model demonstration used a commercial renovation project. The results suggest that overlapping risks have a high potential impact on the total cost, although with a high probability of attaining the target duration. Eight top risks affected the total duration, cost, or both. The optimum overlapping to reduce the economic impact and achieve the target project duration combines different overlapping degrees. This study contribution is a model for fast-track projects considering overlapping risks, their impact characteristic as a distribution, and the potential relationship between these risks.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Risk assessment for construction projects of transport infrastructure objects
    Titarenko, Boris
    ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [22] Time and Cost-Optimized Decision Support Model for Fast-Track Projects
    Cho, Kyuman
    Hastak, Makarand
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 90 - 101
  • [23] Interfaces between complex, fast-track turnkey projects
    Bamberg, W
    Elms, CP
    AUTOMATED PEOPLE MOVERS VI: CREATIVE ACCESS FOR MAJOR ACTIVITY CENTERS, 1998, : 741 - 750
  • [24] REDUCING CRR IN FAST-TRACK PROJECTS THROUGH BIM
    Abdelbary, Marwan
    Edkins, Andrew
    Dorra, Elkhayam M.
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2020, 25 (25): : 140 - 160
  • [25] Fast-track construction - motivation, history & concepts
    Forman, Patrick
    Glock, Christian
    Mark, Peter
    BETON- UND STAHLBETONBAU, 2021, 116 (S2) : 2 - 11
  • [26] Fast-track construction of large warehouse floors
    Harvey, D.
    Concrete (London), 2001, 35 (08):
  • [27] FAST-TRACK PROS AND CONS - CONSIDERATIONS FOR INDUSTRIAL PROJECTS
    WILLIAMS, GV
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (05) : 24 - 32
  • [28] Consider 'lean' engineering to fast-track mega projects
    Bennett, S.
    HYDROCARBON PROCESSING, 2012, 91 (12): : 55 - 56
  • [29] Geographic information system for coordination of fast-track projects
    Shanmugam, SP
    Parvatham, R
    Varghese, K
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2002, 17 (04) : 294 - 306
  • [30] Fast-track earthquake risk assessment for selected urban areas in Turkey
    Kepekci, D.
    Ozcep, F.
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2011, 11 (02) : 571 - 585